Solar Photovoltaic at Grunau Headquarters

Description Solar Photovoltaic Array system installed on roof of 20,000 sq ft office to convert sunlight into usable electricity; Grunau Corp HQ received LEED EB Gold rating in 2009 - View Case Study
Owner Grunau Company, Inc.
Date Completed November 2010
Solar Photovoltaic at Grunau Headquarters
Solar Photovoltaic at Grunau Headquarters
Solar Photovoltaic at Grunau Headquarters

M & I Bank ~ New Berlin

Description Geothermal heat pump system install with 8 each 350-feet deep wells, pipe headers and system air distribution
Owner Marshall & Illsey
General Contractor BCI - Bukacek
Date Completed March 2010

Westbrook Corporate Center

Description Fire Protection
Owner Burke Properties
General Contractor Berghammer
Architect Stephen Perry Smith
Man-hours 2,514.00
Date Completed January 2010

Baird ~ Training Floor

Description HVAC, Fire Protection, Specialty Metal Fab
Owner US Bank / Baird Corp.
General Contractor Gilbane
Architect Gensler
Engineer Gosentini
Man-hours 4,882.00
Date Completed April 2009

Johnson Controls

Description Geothermal Exchange System consisting of 272 wells, vaults, associated piping and trenching / backfilling at world headquarters office
Owner Johnson Controls
General Contractor Hunzinger Construction
Architect Gensler
Engineer Affiliated Engineers
Man-hours 4,690.00
Date Completed December 2008

Wisvest ~ Cooling Tower

Description Grunau completed a cooling tower addition project
Owner Wisvest LLC
Engineer Ring & DuChateau
Man-hours 3,068.00
Date Completed December 2008

Northwestern Mutual ~ Franklin Phase II

Northwestern Mutual ~ Franklin Phase II
Description Design/Assist, HVAC, Plumbing, Fire Protection, Specialty Metal Fab
Owner Northwestern Mutual
General Contractor Opus
Architect Eppstein Uhen Architects
Engineer Affiliated Engineers
Man-hours 55,766.00
Date Completed August 2008

Mayfair Woods Business & Technology Center

Description Design/Build, HVAC; LEED CS Silver rating in 2008
Owner Irgens Development
General Contractor C.G. Schmidt, Inc.
Architect PRA
Engineer Grunau Company
Man-hours 4,722.00
Date Completed May 2008

Metavante ~ Phase II

Description HVAC: Installed PAC units in data center
Owner Metavante
Engineer Miller Engineering
Man-hours 2,878.00
Date Completed December 2007

Metavante ~ UPS System

Description HVAC: Installed UPS system in Data Center
Owner Metavante
Engineer Miller Engineering
Man-hours 1,676.00
Date Completed December 2007

Penske Truck Leasing

Description Plumbing
Owner Penske Truck
General Contractor Schuh Construction
Engineer Graef Anhalt Schloemer
Man-hours 1,961.00
Date Completed June 2007

University Club Tower

University Club Tower
Description Specialty Metal Fabrication work in multi-use building including condominiums, guest suites, health club, and dining facilities.
Owner University Club, LLC
General Contractor J.H. Findorff & Son, Inc.
Architect Skidmore, Owings and Merrill, LLP
Man-hours 7,721.00
Date Completed June 2007

Manpower Corporate Headquarters

Manpower Corporate Headquarters
Description Design/Build, HVAC, Plumbing, Fire Protection, Underground Site Utilities, Temperature Controls (Electrical), Specialty Metal Fab; LEED NC Gold Rating in 2009
Owner Riverbend Place LLC
General Contractor Gilbane Building Co.
Architect Eppstein Uhen Architects
Engineer STS Consultants
Man-hours 28,721.00
Date Completed May 2007

Advanced Healthcare ~ Corporate Headquarters

Advanced Healthcare ~ Corporate Headquarters
Description Design/Build, HVAC, Temperature Controls (Electrical)
Owner Advanced Healthcare
General Contractor Midwest Design & Development
Engineer Grunau Company
Date Completed April 2007

U-Haul Storage

Description Design/Build, Fire Protection
General Contractor Seasafe Company
Architect Archicon Canada, Inc.
Engineer Marshris Engineering
Man-hours 1,245.00
Date Completed December 2006

211 West Wisconsin Avenue

Description Fire Protection, Plumbing, Underground Site Utilities
General Contractor Berghammer Corporation
Architect Eppstein Uhen Architects
Date Completed June 2006

GE Medical Health Center & Research Park

GE Medical Health Center & Research Park
Description Design/Build, HVAC
Owner Irgens Development
General Contractor C.G. Schmidt, Inc.
Architect Eppstein Uhen Architects
Engineer Grunau Company
Date Completed January 2006

HGA

Description Design/Build, HVAC Underfloor System
Owner Mandel Group
General Contractor J.H. Findorff
Architect HGA
Engineer Grunau Company
Man-hours 2,723.00
Date Completed September 2005

API Software

API Software
Description Design/Build, HVAC, Plumbing, Underground Site Utilities for Hartford office building
Owner API Software
General Contractor KBS Construction
Architect Excel
Engineer Grunau Company
Date Completed May 2005

Aurora Health Care ~ Computer Room Expansion

Description In a 2-phase computer room expansion project at Aurora Health Care's corporate facility, Grunau installed a new glycol cooler system, fire suppression system, UPS unit and generator, plus Specialty Metals work including rooftop platforms, catwalks, railings and stairs. - View Case Study
Owner Aurora Health Care
General Contractor Grunau Company
Architect Grunau Company
Engineer Grunau Company
Date Completed May 2005

Thomson Beta

Description HVAC, Plumbing, Fire Protection, Special Hazards
Owner Thomson Beta
General Contractor Opus Corporation
Architect Eppstein Uhen
Engineer Affiliated Engineers
Date Completed April 2005

IN ~ Market Tower

Description Fire protection system service, inspections and maintenance of electric fire pump, two dry pipe systems, wet pipe sprinkler system, and preaction sprinkler system in 495,000 square foot office and retail complex
Owner Colliers Turley Martin Tucker
Date Completed January 2005

IN ~ One American Square

Description Installed kitchen hood fire suppression system, halon system, preaction sprinkler system, two anti-freeze systems, three dry pipe sprinkler systems, wet pipe sprinkler system, and two fire pumps (one electric, one diesel). Continue to follow up with regular fire protection inspections and modifications in office complex
Owner Colliers Turley Martin Tucker
Date Completed January 2005

IN ~ Regis Bank Tower

Description Installed two dry pipe fire protection systems, wet pipe system, three deluge systems, and electric fire pump in 2005. Maintain ongoing service, maintenance and inspections of thier fire protection system.
Owner McKnight Property Management, LLC
Date Completed January 2005

IN ~ State Office Building Complex

Description Installed wet and dry pipe fire protection systems, two fire pumps (electric and diesel)
Owner State of Indiana
General Contractor Glenroy Construction
Date Completed January 2005

IN ~ U.S. Air Maintenance Aircraft Hangar

Description Installed wet pipe fire protection systems, foam systems, five diesel fire pumps, deluge systems, two water storage tanks at airport hangar
Owner U.S. Air
Date Completed January 2005

IN ~ United Airlines Maintenance Hangars

Description Installed wet pipe fire protections systems and foam systems at airport hangars
Owner United Airlines
Date Completed January 2005

FL ~ Omni Hotel at ChampionsGate

Description Installed fire protection system for hotel's ballroom, restaurant and retail stores, including 1,000-gallons per minute fire pump, 5,000-head sprinkler system and six standpipes
Owner Omni Hotels
General Contractor Welbro
Date Completed April 2004

Northwestern Mutual ~ Franklin Campus ~ Grunau Metals

Description Specialty metals fabrication of railings and stairs; also completed HVAC and plumbing; see separate Mechanicals Project entry to read the mechanical case study - View Case Study
Owner Northwestern Mutual
General Contractor Opus North Corporation
Architect Eppstein Uhen Architects
Engineer Affiliated Engineers
Date Completed April 2004
Northwestern Mutual ~ Franklin Campus ~ Grunau Metals
Photo Courtesy of Northwestern Mutual. Copyright 2004
Northwestern Mutual ~ Franklin Campus ~ Grunau Metals
Northwestern Mutual ~ Franklin Campus ~ Grunau Metals

Northwestern Mutual ~ Franklin Campus ~ Mechanicals

Description HVAC, plumbing, and also completed speciaty metals fabrication of handrails and stairs; see separate Grunau Metals Project entry to read that case study - View Case Study
Owner Northwestern Mutual
General Contractor Opus North Corporation
Architect Eppstein Uhen
Engineer Affiliated Engineers
Date Completed April 2004
Northwestern Mutual ~ Franklin Campus ~ Mechanicals
Photo Courtesy of Opus North
Northwestern Mutual ~ Franklin Campus ~ Mechanicals
Northwestern Mutual ~ Franklin Campus ~ Mechanicals
Photo courtesy of Northwestern Mutual. Copyright 2004

E-Funds

Description Tenant HVAC build-out
Owner Liberty Property
General Contractor Berghammer Corporation
Architect Zimmerman Design Group
Engineer Grunau Company
Date Completed 2004

GE Medical Systems

Description HVAC, Plumbing
Owner GE Medical Systems
General Contractor Jansen Group
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed July 2003

PA ~ Verizon

Description Furnished standpipes and installed fire department valves, test and drain riser, 180 sprinklers, and 2-hour insulation
Owner Verizon, PA
General Contractor Jendoco Construction Company
Engineer LLI Technologies, Inc.
Date Completed June 2003

Honeycreek IV Corporate Center

Description Plumbing, HVAC
Owner Opus North Corporation
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Date Completed May 2003

FL ~ Osceola Agricultural Center

FL ~ Osceola Agricultural Center
Description Installed 4,000 sprinklers, 1000 GPM fire pump in arena and exhibition facility
Owner Osceola County
General Contractor Centrex Rooney, Gray Construction
Date Completed January 2003

Johnson Building

Description Canopies, Stairwells, Railings, Specialty Metal Fabrication for bank and office space - View Case Study
Owner Johnson Bank
General Contractor Mortenson
Architect Eppstein Uhen Architects
Engineer Pierce Engineers
Man-hours 16,398.50
What Our Customers Say The Johnson Building is a reflection of how Grunau Metals consistently does business: focused on quality and respectful of our budget. It wasn't a surprise that the team did a great job. ~ Scott Weas, Owner's Representative for Johnson Bank - Weas Development
Date Completed August 2002
Johnson Building
Courtesy of Johnson Bank
Johnson Building
Courtesy of Johnson Bank

PA ~ Magee Hospital Parking Garage

Description Installed dry pipe sprinkler system and dry standpipe system in parking garage of Magee Hospital
Owner Magee Women's Hospital
General Contractor Turner Construction Company
Architect Tsoi/Kobus Associates
Date Completed March 2002

Runzheimer International ~ Headquarters

Description Engineering services, HVAC
Owner Runzheimer International
General Contractor Berghammer Corporation
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed October 2001

Honeycreek III Corporate Center

Description Engineering services, HVAC
Owner Opus North Corporation
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Date Completed June 2001

Time Warner Cable

Time Warner Cable
Description Engineering services, HVAC, Plumbing, Fire Protection for Time Warner Cable's offices
Owner Wisconsin Electric
General Contractor GPD/Gilbane
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed June 2001

Ivory Tusk

Description Structural steel, Stairs, Specialty metal fabrication
Date Completed May 2001

401 Woodland Prime

401 Woodland Prime
Description HVAC, Plumbing
Owner Weas Development
Date Completed January 2001

500 Woodland Prime

Description Plumbing, HVAC for a 3-story 120,000 sq ft office building
Owner Weas Development
General Contractor Jansen Company
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed December 2000

Honeycreek II Corporate Center

Honeycreek II Corporate Center
Description Engineering services, HVAC
Owner Opus North Corporation
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Date Completed August 2000

Alternative Living Services ~ Corporate Headquarters

Alternative Living Services ~ Corporate Headquarters
Description Plumbing, HVAC, Underground Site Utilities
Owner ALS
General Contractor Hunzinger Construction
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed January 2000

Third Ward Parking Structure

Third Ward Parking Structure
Description Specialty metal fabrication, handrails
Date Completed 2000

PA ~ Cherrington Corporate Center

Description Furnished and installed wet pipe sprinkler system with standpipes
Owner Cherrington Corporate Center, Eaton, Cytler Hammer
General Contractor Clayco Construction Company, Inc.
Engineer Code Consultants, Inc.
Date Completed January 1999

PA ~ Southpointe

Description Installed fire sprinklers, standpipes, wet pipe sprinkler systems, alarm and detection systems in various buildings of a commercial and residential development
Owner Scalo Case Development Company
General Contractor Mosites Construction Company
Architect Lorenzi Dodds & Gunill
Date Completed January 1998

SC Johnson ~ Worldwide Headquarters

Description HVAC
Owner SC Johnson Worldwide
General Contractor Mortenson, Riley Construction
Date Completed May 1997