| Description |
Stairs and railings, Specialty metal fabrication at Edward Bain School of Language and Art - View Case Study |
| Owner |
Kenosha Unified School District #1 |
| General Contractor |
Riley Construction |
| Architect |
Bray Associates Architects |
| Engineer |
Ambrose Engineering, Inc. |
| What Our Customers Say |
"Grunau Metals did a great job. They made sure we had permanent stairs as soon as the second floor was erected - the way it should be done." Tom Riley, President - Riley Construction |
| Date Completed |
March 2004 |