FL ~ Peabody Hotel

Description Installed sprinklers in new 34 story hotel and 2-story convention center; installed 2 new fire pumps underground per the fire proteciton drawings
Owner Peabody Hotel
General Contractor Balfour Beatty Construction
Date Completed November 2010
FL ~ Peabody Hotel
FL ~ Peabody Hotel
FL ~ Peabody Hotel

Potawatomi Bingo Casino Expansion

Potawatomi Bingo Casino Expansion
Description HVAC, Underground Site Utilities, Specialty Metal Fabrication, Parking Deck
Owner Forest County Potawatomi Community
General Contractor Gilbane Building Company
Architect Hnedak BoBo Group
Man-hours 40,783.00
Date Completed August 2008

FL ~ Disneyland Soarin Over California

Description Installed a fire protection system for Disney's theme park attraction of a simulator ride. Blended sprinklers into the scenes and background of the ride.
Owner Walt Disney World
General Contractor PCL Construction
Date Completed April 2005

IN ~ Artsgarden

IN ~ Artsgarden
Description Designed wet pipe fire protection system to follow rounded building structure in Indiana. Grunau's Milwaukee shop fabricated piping network. Building is operated by the Arts Council of Indianapolis.
Owner Simon Malls
Date Completed January 2005

IN ~ Emison Art Center

IN ~ Emison Art Center
Description Installed preaction fire protection systems in areas with non-replaceable art pieces, and installed wet pipe sprinkler systems
Owner DePauw University
General Contractor Shiel Sexton
Architect CSO Schenkel Shultz Architects
Engineer F & G Engineers, Inc.
Date Completed January 2005

FL ~ Omni Hotel at ChampionsGate

Description Installed fire protection system for hotel's ballroom, restaurant and retail stores, including 1,000-gallons per minute fire pump, 5,000-head sprinkler system and six standpipes
Owner Omni Hotels
General Contractor Welbro
Date Completed April 2004

FL ~ Bethune-Cookman Center for the Performing Arts

FL ~ Bethune-Cookman Center for the Performing Arts
Description 5 Standpipes, 1250 GPM Fire Pump
General Contractor Stellar Group
Date Completed January 2003

FL ~ Mission Space at Disney World

FL ~ Mission Space at Disney World
Description Fire protection system install at Disney's theme park
Owner Walt Disney Company
General Contractor Mivan Florida, Inc.
Date Completed January 2003

FL ~ Osceola Agricultural Center

FL ~ Osceola Agricultural Center
Description Installed 4,000 sprinklers, 1000 GPM fire pump in arena and exhibition facility
Owner Osceola County
General Contractor Centrex Rooney, Gray Construction
Date Completed January 2003

PA ~ Steven C. Foster Memorial Theatre

Description Installed 125 wet and dry sprinklers
Owner University of Pittsburgh
General Contractor Poerio, Inc.
Architect WTW
Engineer H.F. Lenz
Date Completed September 2002

PA ~ Carnegie Museum of Pittsburgh

Description Installed fire line, standpipes, 1,300 sprinkler heads, and electrical wiring of installed flow and tamper switches. Reprogrammed fire alarm panel.
Owner Carnegie Museum of Pittsburgh
Engineer Eichleay Engineering, Inc.
Date Completed August 2002

FL ~ Disney Vacation Club - Beach Club Villas

FL ~ Disney Vacation Club - Beach Club Villas
Description 6,000 Sprinklers
Owner Walt Disney Company
General Contractor PCL Construction
Date Completed January 2002

FL ~ Gaylord Palm Hotel and Convention Center

FL ~ Gaylord Palm Hotel and Convention Center
Description 20,000 Sprinklers, 81 Wet systems, Dry system, Preaction system, 225,000 feet of fire protection piping
Owner Gaylord Entertainment
General Contractor Perini, Suitt
Date Completed January 2002

PA ~ Petersen Events Center

Description Installed 1000 gmp electric fire pump, wet and dry sprinklers
Owner University of Pittsburgh
General Contractor Pitt Center Partners
Architect Apostoluo, Russer
Engineer Brinjac Engineering
Date Completed January 2001

FL ~ Epcot Center Millennium Village

Description Sprinkler heads, Deluge system at Disney World's Epcot Center theme park
Owner Walt Disney Company
General Contractor American Bridge, Mivan Florida, B.V.C.S
Date Completed September 1999

FL ~ Universal Studios

Description Installed sprinklers in 33 buildings and diesel fire pumps with 4500 feet of underground supply with fire hydrants for Universal Studios theme park
Owner Universal Studios
General Contractor Whiting Turner Construction Company
Date Completed January 1999
Grunau Logo 2
Nuvo Construction Company, Inc. would like to offer sincere appreciation to the entire staff of the Grunau Company for their hard work, timeliness, and extension of services above and beyond what was required in recent projects. Grunau Company and its employees have been an asset to the success of many of our projects, and will continue to be considered as a primary support in the future success of Nuvo Construction Company, Inc.”
- Scott Farina, Project Manager at Nuvo Construction Company, Inc.
more »