Alverno College
| Description | Structural & Miscellaneous Metals, Plumbing, Underground Site Utilities for a new parking structure and campus renovations |
| Owner | Alverno College |
| General Contractor | Gilbane Building Co. |
| Architect | Uihlein Wilson Architects |
| Date Completed | September 2006 |
IN ~ Carmel High School Freshman Center
| Description | Installed fire protection systems in new freshman facility, including a fire pump, standpipes, five sprinkler systems and 2,000 feet of underground water mains |
| Owner | Carmel Clay School Corporation |
| General Contractor | The Skillman Corporation (Construction Manager) |
| Architect | Fanning/Howey Associates |
| Engineer | Fanning/Howey Associates |
| Date Completed | August 2005 |
IN ~ Ben Davis High School
| Description | Wet pipe fire protection systems |
| Date Completed | January 2005 |
IN ~ Decatur Intermediate School
| Description | Installed 1,200 fire protection sprinklers |
| Owner | Decatur Township |
| Architect | CSO Schenkel Shultz Architects |
| Date Completed | January 2005 |
IN ~ Emison Art Center
| Description | Installed preaction fire protection systems in areas with non-replaceable art pieces, and installed wet pipe sprinkler systems |
| Owner | DePauw University |
| General Contractor | Shiel Sexton |
| Architect | CSO Schenkel Shultz Architects |
| Engineer | F & G Engineers, Inc. |
| Date Completed | January 2005 |
IN ~ Purdue Biomedical Building
| Description | Installed four wet pipe sprinkler systems, 1,200 sprinkler heads, and dry standpipe fire protection |
| Owner | Purdue University |
| General Contractor | Kettlehut Construction, Inc. |
| Architect | BSA LifeStructures |
| Engineer | BSA LifeStructures |
| Date Completed | January 2005 |
IN ~ Rose-Hulman Institute of Technology
| Description | Installation of fire protection systems, including 37 wet pipe systems, five dry pipe systems, one anti-freeze system and two fire pumps (one electrical, one diesel) in 2005. Ongoing service, mainenance and inspections of their fire protection systems. |
| Owner | Rose Hulman-Institute of Technology |
| Date Completed | January 2005 |
PA ~ Biomedical Science Tower - University of Pittsburgh
| Description | Installed wet and dry fire protection systems including two preaction systems and two clean agent fire suppression systems in a new 10-story biomedical science building on the University campus |
| Owner | University of Pittsburgh |
| General Contractor | Mascaro/Hunt |
| Date Completed | January 2005 |
PA ~ JC Williams Hall & St Thomas More Hall at Franciscan University of Steubenville
| Description | Retrofitted fire protection systems for university dorms and student center, including wet pipe and sprinkler systems |
| Owner | Franciscan University of Steubenville |
| General Contractor | Massaro Corporation |
| Date Completed | January 2005 |
Marquette University Memorial Library
| Description | HVAC remodel of 50-year old library, design/build project |
| Owner | Marquette University |
| General Contractor | Opus North Corporation |
| Architect | Opus & A&E |
| Engineer | Grunau Company |
| Date Completed | December 2004 |
Marquette University McGuire Center
| Description | Plumbing, HVAC, Fire Protection |
| Owner | Marquette University |
| General Contractor | Opus North Corp |
| Architect | Opus North Architects |
| Engineer | Grunau Company |
| Man-hours | 21,171.00 |
| Date Completed | March 2004 |
IN ~ DePauw University
| Description | INstalled wet pipe sprinkler systems, fire pump, standpipes, and sprinkler heads |
| Owner | DePauw University |
| General Contractor | A.A. Huber & Sons |
| Architect | CSO Architects |
| Date Completed | January 2003 |
PA ~ Holland Hall at Univ of Pittsburgh
| Description | Installed wet pipe sprinkler, standpipe, two dry fire protection systems, and replaced fire department valves |
| Owner | University of Pittsburgh |
| General Contractor | Burchick Construction Company |
| Engineer | Burt, Hill, Kosar, Rittleman Associates |
| Date Completed | January 2003 |
PA ~ Steven C. Foster Memorial Theatre
| Description | Installed 125 wet and dry sprinklers |
| Owner | University of Pittsburgh |
| General Contractor | Poerio, Inc. |
| Architect | WTW |
| Engineer | H.F. Lenz |
| Date Completed | September 2002 |
Edison School
| Description | Installed high efficiency boilers |
| Owner | Edison School |
| General Contractor | GPD/Gilbane |
| Engineer | Grunau Company |
| Date Completed | October 2001 |
PA ~ Litchfield Towers- Univ of Pittsburgh
| Description | Installed wet sprinklers, water service for secondary supply, dry system, and diesel fire pump in Towers A, B, and C with acoustical ceilings and drywall |
| Owner | University of Pittsburgh |
| Engineer | Burt, Hill, Kosar, Rittleman Associates |
| Date Completed | January 2001 |
PA ~ Petersen Events Center
| Description | Installed 1000 gmp electric fire pump, wet and dry sprinklers |
| Owner | University of Pittsburgh |
| General Contractor | Pitt Center Partners |
| Architect | Apostoluo, Russer |
| Engineer | Brinjac Engineering |
| Date Completed | January 2001 |
Edison School ~ Remodeling
| Description | Plumbing, fire protection, and HVAC for 95,000 sq. ft. remodeling |
| Owner | Milwaukee County |
| General Contractor | GPD/Gilbane |
| Engineer | Grunau Company |
| Date Completed | August 2000 |