Miller Brewing Company / MillerCoors
| Description | Engineering services, Underground Site Utilities, Plumbing, HVAC, Service and Maintenance. Grunau Company has provided mechanical services to Miller Brewing Company/MillerCoors for over 35 years. This broad range of services includes all mechanical installations in six new breweries, as well as continuous service to Milwaukee breweries. - View Case Study |
| Owner | MillerCoors |
| What Our Customers Say | Grunau was involved in the construction of many of our buildings and their continued involvement in the day-to-day operations of the facility continues to benefit Miller. The relationship our companies have enjoyed over the years is a testimony to the trust factor we have established and the values we share. The personal involvement by Grunau's management ensures a very high level of customer satisfaction. ~ Tom Blaedon, Corporate Facilities Manager at Miller |
| Date Completed | January 2012 |
OH ~ Cardinal Power Plant
| Description | Replaced old CO2 fire suppression system with a double interlock preaction fire protection system around coal pipes at coal-fired power plant |
| Owner | Cardinal Power Plant |
| What Our Customers Say | Project Manager Jack Carney and the Grunau team are a real class act and were great to work with. ~ Doug Van Nuys, Fire Protection Supervisor at Cardinal |
| Date Completed | July 2011 |
OH ~ W.H. Sammis Power Plant
| Description | Deluge protection system for industrial transformer at coal-fired power plant |
| Owner | W.H. Sammis Power Plant |
| Date Completed | January 2011 |
U-Haul Storage
| Description | Design/Build, Fire Protection |
| General Contractor | Seasafe Company |
| Architect | Archicon Canada, Inc. |
| Engineer | Marshris Engineering |
| Man-hours | 1,245.00 |
| Date Completed | December 2006 |
Badger Meter
| Description | Process piping & specialty metal fabrication teams completed a new production test line that checks accuracy |
| Owner | Badger Meter |
| General Contractor | Grunau Company |
| Architect | Arnold & O'Sheridan |
| Engineer | Grunau Company |
| Date Completed | August 2006 |
IN ~ Allomatic Products Company
| Description | Installed wet pipe fire protection systems, halon system, service, maintenance and inspection for systems in 2005. Maintain ongoing fire protection inspections and maintenance. |
| Owner | Allomatic Products Company |
| Date Completed | January 2005 |
IN ~ Dow Agrosciences
| Description | Inspection of wet pipe fire protection systems for research center, preaction sprinkler system, fire pump |
| Owner | Dow Chemical Company |
| Date Completed | January 2005 |
IN ~ General Electric Plant
| Description | Two fire pump systems (one electric, one diesel), 20 wet pipe systems, dry pipe system, foam system |
| Owner | General Electric |
| Date Completed | January 2005 |
IN ~ Reilly Chemical Company
| Description | Installed fire protection systems for chemical plant, two fire pumps (electric and diesel), wet and dry pipe systems, deluge tank system, foam systems, and two preaction systems in 2005. Maintain ongoing insepctions and service of their fire protection system. |
| Owner | Reilly Industries |
| Date Completed | January 2005 |
PA ~ Alliant Foodservice
| Description | Converted wet fire protection system to dry fire protection system. Installed a double-lock preaction system in a cooler/freezer and an Early Suppression, Fast Response (ESFR) wet system for dry storage |
| Owner | Alliant Foodservice |
| General Contractor | Environmental Structures |
| Date Completed | January 2005 |
BioGenesis Enterprises, Inc.
| Description | Engineering services and Specialty Metal Fabrication for soil and sediment washing machines - View Case Study |
| Owner | BioGenesis Enterprises, Inc. |
| Engineer | Grunau Metals and BioGenesis |
| What Our Customers Say | We chose Grunau Metals because they're not a typical subcontractor. Instead, they are partners in our projects, helping us overcome the challenges and celebrating the successes. That's the kind of cooperation and dedication we need. ~ Masood Amiran, BioGenesis Enterprises, Inc. |
| Date Completed | August 2003 |
Permacel
| Description | Equipment setting, process piping, ductwork, and specialty metal fabrication for new special adhesive manufacturing facility |
| Owner | Nitto Denko |
| General Contractor | Grunau Company |
| Engineer | Nitto Denko |
| Man-hours | 47,522.00 |
| Date Completed | December 2002 |
Henri's Foods ~ Germantown Relocation
| Description | CIP and utility piping for salsa and tomato paste food processing lines |
| Owner | Unilever Best Foods |
| Architect | Ambitech |
| Date Completed | November 2002 |
Miller Brewing Company Filter #4
| Description | Set equipment, installed process piping and controls |
| Owner | Miller Brewing Company |
| Man-hours | 6,799.00 |
| Date Completed | September 2002 |
Bombardier
| Description | Process exhaust, specialty metal fabrication |
| Owner | Bombardier |
| General Contractor | Axor, Inc. |
| Architect | Arnold & O'Sheridan |
| Engineer | Arnold & O'Sheridan |
| Date Completed | September 2001 |