Recycling Education Center, City of Milwaukee

Description Geothermal system with (4) heat pumps, (5) circulating and zone pumps, (12) 300 feet deep wells and fused piping
Owner City of Milwaukee
Engineer Frederickson Engineering
Man-hours 918.00
Date Completed November 2007

Taylor Woods, Water Boosting Station

Description Sitework, Plumbing, HVAC
Owner Village of Menomonee Falls
General Contractor Sonag Company
Architect Clark Dietz, Inc.
Engineer Clark Dietz, Inc.
Man-hours 700.00
Date Completed April 2007

Jones Island WWTP

Description Instrumentation and HVAC Upgrades
Owner MMSD
General Contractor Staff Electric
Engineer CDM
Man-hours 4,479.00
Date Completed January 2006
Grunau Logo 2
The fire protection system at the Flint Hills Resources Milwaukee Terminal offered some unique challenges to Grunau, and they performed exceptionally at every turn. The site restrictions and customer expectations could not have been any higher, and the Grunau personnel rose above the restrictions and led the effort to complete, commission, and train the Owner on a system that they were not familiar with. Performance specifications can often prove difficult with subcontractors that are not familiar with a design-build firm, but Grunau provided excellent services and delivered on their promise. It was a pleasure to have the opportunity to work with Eric Radke and the good people at Grunau.”