Projects

Location: Florida

FL ~ Peabody Hotel

Description Installed sprinklers in new 34 story hotel and 2-story convention center; installed 2 new fire pumps underground per the fire proteciton drawings
Owner Peabody Hotel
General Contractor Balfour Beatty Construction
Date Completed November 2010
FL ~ Peabody Hotel
FL ~ Peabody Hotel
FL ~ Peabody Hotel

FL ~ SVP Treatment Center

Description Design/Build project; Grunau designed, fabricated and installed interior wet fire sprinkler systems utilizing flexhead drops. Grunau started one foot above the finished floor.
Owner Dept of Children and Family Services
General Contractor Clark Construction Group
Date Completed September 2008

FL ~ Holmes Regional Medical Center

Description Installed fire protection systems in eight-story expansion including operating room and trauma units, a foam system for the helo-port, three standpipes, and a 3,800-head sprinkler system
Owner Holmes Regional Medical Center
General Contractor Bovis Lend Lease
Date Completed January 2006

FL ~ Kennedy Space Center, Shuttle Launch Pads A and B

Description Retrofitted fire protection systems, including preaction, a fixed water spray system in tunnels leading to the launch pads, and adjusted PRV sprinklers to tie into high pressure underground extinguishing system
Owner NASA
General Contractor Ivey's Construction
Date Completed August 2005

FL ~ Disneyland Soarin Over California

Description Installed a fire protection system for Disney's theme park attraction of a simulator ride. Blended sprinklers into the scenes and background of the ride.
Owner Walt Disney World
General Contractor PCL Construction
Date Completed April 2005

FL ~ Pinellas County Jail

Description Outfitted cells and dormitory housing with fire protection systems, 750-gallons per minute fire pumps, six standpipes and a 1,500-head sprinkler system
Owner Pinellas County
General Contractor Skanska
Date Completed January 2005

FL ~ Naval Air Station

Description Retrofitted fire protection systems on Hangar 1000 in Jacksonville, FL while facility was occupied. Replaced overhead wet systems and three fire pumps; installed low level water foam/canon system.
Owner U.S. Government
General Contractor Sauer
Date Completed September 2004

FL ~ Omni Hotel at ChampionsGate

Description Installed fire protection system for hotel's ballroom, restaurant and retail stores, including 1,000-gallons per minute fire pump, 5,000-head sprinkler system and six standpipes
Owner Omni Hotels
General Contractor Welbro
Date Completed April 2004

FL ~ Bethune-Cookman Center for the Performing Arts

FL ~ Bethune-Cookman Center for the Performing Arts
Description 5 Standpipes, 1250 GPM Fire Pump
General Contractor Stellar Group
Date Completed January 2003

FL ~ Festival Bay Mall

FL ~ Festival Bay Mall
Description Designed, fabricated and installed 6,500 sprinklers, 46 Hose stations, 1,000 GPM fire pump, 17 systems, water feature
General Contractor Beck Construction
Date Completed January 2003

FL ~ Mission Space at Disney World

FL ~ Mission Space at Disney World
Description Fire protection system install at Disney's theme park
Owner Walt Disney Company
General Contractor Mivan Florida, Inc.
Date Completed January 2003

FL ~ Osceola Agricultural Center

FL ~ Osceola Agricultural Center
Description Installed 4,000 sprinklers, 1000 GPM fire pump in arena and exhibition facility
Owner Osceola County
General Contractor Centrex Rooney, Gray Construction
Date Completed January 2003

FL ~ Bloomingdales

FL ~ Bloomingdales
Description 2,000 Sprinklers, 1250 GPM Fire Pump
Owner Federated Department Stores
Date Completed January 2002

FL ~ Disney Vacation Club - Beach Club Villas

FL ~ Disney Vacation Club - Beach Club Villas
Description 6,000 Sprinklers
Owner Walt Disney Company
General Contractor PCL Construction
Date Completed January 2002

FL ~ Gaylord Palm Hotel and Convention Center

FL ~ Gaylord Palm Hotel and Convention Center
Description 20,000 Sprinklers, 81 Wet systems, Dry system, Preaction system, 225,000 feet of fire protection piping
Owner Gaylord Entertainment
General Contractor Perini, Suitt
Date Completed January 2002

FL ~ Parrish Medical Center

FL ~ Parrish Medical Center
Description Installed 3,600 sprinklers,1000 GPM fire pump
General Contractor Skanska Construction
Date Completed January 2002

FL ~ Kennedy Space Center

Description Wet pipe sprinkler system
Owner NASA
General Contractor Ivey's Construction
Date Completed January 2000

FL ~ Epcot Center Millennium Village

Description Sprinkler heads, Deluge system at Disney World's Epcot Center theme park
Owner Walt Disney Company
General Contractor American Bridge, Mivan Florida, B.V.C.S
Date Completed September 1999

FL ~ Universal Studios

Description Installed sprinklers in 33 buildings and diesel fire pumps with 4500 feet of underground supply with fire hydrants for Universal Studios theme park
Owner Universal Studios
General Contractor Whiting Turner Construction Company
Date Completed January 1999