Grunau's team in Pennsylvania has completed many projects for a variety of clients. Some of the solutions used for these projects include dry agent fire suppression, wet and dry sprinkler systems, and preaction systems. Universities, hospitals, and commercial buildings are just a few of the industries that Grunau serves.

PA ~ Alliant Foodservice

Description Converted wet fire protection system to dry fire protection system. Installed a double-lock preaction system in a cooler/freezer and an Early Suppression, Fast Response (ESFR) wet system for dry storage
Owner Alliant Foodservice
General Contractor Environmental Structures
Date Completed January 2005

PA ~ Biomedical Science Tower - University of Pittsburgh

Description Installed wet and dry fire protection systems including two preaction systems and two clean agent fire suppression systems in a new 10-story biomedical science building on the University campus
Owner University of Pittsburgh
General Contractor Mascaro/Hunt
Date Completed January 2005

PA ~ JC Williams Hall & St Thomas More Hall at Franciscan University of Steubenville

Description Retrofitted fire protection systems for university dorms and student center, including wet pipe and sprinkler systems
Owner Franciscan University of Steubenville
General Contractor Massaro Corporation
Date Completed January 2005

PA ~ Latrobe Hospital

Description Installed wet and dry sprinkler systems for emergency room relocation
Owner Latrobe Hospital
General Contractor A. Martini & Sons
Date Completed January 2005

PA ~ Verizon

Description Furnished standpipes and installed fire department valves, test and drain riser, 180 sprinklers, and 2-hour insulation
Owner Verizon, PA
General Contractor Jendoco Construction Company
Engineer LLI Technologies, Inc.
Date Completed June 2003

PA ~ Holland Hall at Univ of Pittsburgh

Description Installed wet pipe sprinkler, standpipe, two dry fire protection systems, and replaced fire department valves
Owner University of Pittsburgh
General Contractor Burchick Construction Company
Engineer Burt, Hill, Kosar, Rittleman Associates
Date Completed January 2003

PA ~ Steven C. Foster Memorial Theatre

Description Installed 125 wet and dry sprinklers
Owner University of Pittsburgh
General Contractor Poerio, Inc.
Architect WTW
Engineer H.F. Lenz
Date Completed September 2002

PA ~ Carnegie Museum of Pittsburgh

Description Installed fire line, standpipes, 1,300 sprinkler heads, and electrical wiring of installed flow and tamper switches. Reprogrammed fire alarm panel.
Owner Carnegie Museum of Pittsburgh
Engineer Eichleay Engineering, Inc.
Date Completed August 2002

PA ~ Magee Hospital Parking Garage

Description Installed dry pipe sprinkler system and dry standpipe system in parking garage of Magee Hospital
Owner Magee Women's Hospital
General Contractor Turner Construction Company
Architect Tsoi/Kobus Associates
Date Completed March 2002

PA ~ Litchfield Towers- Univ of Pittsburgh

Description Installed wet sprinklers, water service for secondary supply, dry system, and diesel fire pump in Towers A, B, and C with acoustical ceilings and drywall
Owner University of Pittsburgh
Engineer Burt, Hill, Kosar, Rittleman Associates
Date Completed January 2001

PA ~ Petersen Events Center

Description Installed 1000 gmp electric fire pump, wet and dry sprinklers
Owner University of Pittsburgh
General Contractor Pitt Center Partners
Architect Apostoluo, Russer
Engineer Brinjac Engineering
Date Completed January 2001

PA ~ Cherrington Corporate Center

Description Furnished and installed wet pipe sprinkler system with standpipes
Owner Cherrington Corporate Center, Eaton, Cytler Hammer
General Contractor Clayco Construction Company, Inc.
Engineer Code Consultants, Inc.
Date Completed January 1999

PA ~ Southpointe

Description Installed fire sprinklers, standpipes, wet pipe sprinkler systems, alarm and detection systems in various buildings of a commercial and residential development
Owner Scalo Case Development Company
General Contractor Mosites Construction Company
Architect Lorenzi Dodds & Gunill
Date Completed January 1998
Grunau Logo 2
Grunau Fire Protection should be recognized as part of the reason for the Marquette Interchange projects success. The standpipe system they designed was easy to install and the fabrication work done in Grunau’s pipe shop was excellent. The Milwaukee Fire Department is extremely happy with this system.”
- Dennis M. Maney, P.E., Marquette Core Project Manager at Edward Kraemer & Sons, Inc.