Projects

Location: Wisconsin

Target

Description Service and maintenance - Grunau Company's service and maintenance team has a 30-year working relationship with Target Corporation throughout Southeastern Wisconsin. - View Case Study
Owner Target
Date Completed 9999

Miller Brewing Company / MillerCoors

Description Engineering services, Underground Site Utilities, Plumbing, HVAC, Service and Maintenance. Grunau Company has provided mechanical services to Miller Brewing Company/MillerCoors for over 35 years. This broad range of services includes all mechanical installations in six new breweries, as well as continuous service to Milwaukee breweries. - View Case Study
Owner MillerCoors
What Our Customers Say Grunau was involved in the construction of many of our buildings and their continued involvement in the day-to-day operations of the facility continues to benefit Miller. The relationship our companies have enjoyed over the years is a testimony to the trust factor we have established and the values we share. The personal involvement by Grunau's management ensures a very high level of customer satisfaction. ~ Tom Blaedon, Corporate Facilities Manager at Miller
Date Completed January 2012
Miller Brewing Company  / MillerCoors
Miller Brewing Company  / MillerCoors
Photo Courtesy of Miller Brewing Company

Waukesha County Jail Solar Water Heater

Description Installed rooftop 60'x60' thermal solar system with 56 panels to generate power to heat the jail's domestic water (approximately 3,000 gallons used per day). Grunau Metals fabricated and installed the support skeleton while our Plumbers installed the new hot water solar system. - View Case Study
Owner Waukesha County Dept of Public Works
Engineer Angus Young
Date Completed September 2011
Waukesha County Jail Solar Water Heater
Waukesha County Jail Solar Water Heater

Milwaukee County Zoo, Penguin Exhibit

Description Installed new chiller to keep the temperatures refrigerated in the penguin exhibit
Date Completed June 2011
Milwaukee County Zoo, Penguin Exhibit
Milwaukee County Zoo, Penguin Exhibit

Solar Photovoltaic at Grunau Headquarters

Description Solar Photovoltaic Array system installed on roof of 20,000 sq ft office to convert sunlight into usable electricity; Grunau Corp HQ received LEED EB Gold rating in 2009 - View Case Study
Owner Grunau Company, Inc.
Date Completed November 2010
Solar Photovoltaic at Grunau Headquarters
Solar Photovoltaic at Grunau Headquarters
Solar Photovoltaic at Grunau Headquarters

M & I Bank ~ New Berlin

Description Geothermal heat pump system install with 8 each 350-feet deep wells, pipe headers and system air distribution
Owner Marshall & Illsey
General Contractor BCI - Bukacek
Date Completed March 2010

Advanced Healthcare ~ Mequon

Description Design/Build, Plumbing, HVAC, Fire Protection, Medical Gas
Owner Advanced Healthcare
General Contractor CG Schmidt
Architect Welman Architects
Engineer Grunau Company
Man-hours 11,782.00
Date Completed January 2010

River Renaissance Condos

Description Structural & Miscellaneous Steel for Riverwalk Project
Owner River Renaissance LLC
General Contractor VJS Construction Services
Architect Engberg Anderson
Man-hours 11,672.00
Date Completed January 2010

Westbrook Corporate Center

Description Fire Protection
Owner Burke Properties
General Contractor Berghammer
Architect Stephen Perry Smith
Man-hours 2,514.00
Date Completed January 2010

Aurora Medical Center ~ Summit

Aurora Medical Center ~ Summit
Description Design/Assist, HVAC, Plumbing, and Specialty Metal Fab for a new state-of-art 800,000 sq ft medical facility encompassing a hospital, clinic, pharmacy, and the Vince Lombardi Cancer Center.
Owner Aurora Health Care / Hammes
General Contractor Mortenson
Architect Kahn
Engineer KJWW
Man-hours 233,000.00
Date Completed December 2009

St. Luke's Hospital - Healing Garden

Description HVAC
Owner Aurora Health Care
General Contractor M. A. Mortenson Company
Architect Brubaker
Man-hours 12,475.00
Date Completed June 2009

Miller Yeast Brinks - Process

Description Install Process Piping
Owner MillerCoors LLC
Engineer Foth Production Solutions Inc.
Man-hours 6,853.00
Date Completed May 2009

Riverside Pumping Station

Description Plumbing
Owner City of Milwaukee
Man-hours 4,822.00
Date Completed May 2009

Baird ~ Training Floor

Description HVAC, Fire Protection, Specialty Metal Fab
Owner US Bank / Baird Corp.
General Contractor Gilbane
Architect Gensler
Engineer Gosentini
Man-hours 4,882.00
Date Completed April 2009

Advanced Healthcare ~ Grafton

Advanced Healthcare ~ Grafton
Description HVAC, Plumbing, Fire Protection for healthcare clinic
Owner Advanced Healthcare
General Contractor Midwest Design & Development
Architect Midwest Design & Development
Man-hours 8,378.00
Date Completed December 2008

Johnson Controls

Description Geothermal Exchange System consisting of 272 wells, vaults, associated piping and trenching / backfilling at world headquarters office
Owner Johnson Controls
General Contractor Hunzinger Construction
Architect Gensler
Engineer Affiliated Engineers
Man-hours 4,690.00
Date Completed December 2008

JohnsonDiversey Ware Wash

Description HVAC, Plumbing
Owner JohnsonDiversey
General Contractor M. A. Mortenson Company
Man-hours 1,553.00
Date Completed December 2008

Wisvest ~ Cooling Tower

Description Grunau completed a cooling tower addition project
Owner Wisvest LLC
Engineer Ring & DuChateau
Man-hours 3,068.00
Date Completed December 2008

Marquette High School

Description Design/Build HVAC, Plumbing, Fire Protection
Owner Marquette
General Contractor C.G. Schmidt
Architect Eppstein Uhen
Engineer Grunau Company
Man-hours 20,477.00
Date Completed November 2008

Children's Hospital of Wisconsin West Tower Expansion

Children's Hospital of Wisconsin West Tower Expansion
Description Design/Assist Plumbing
Owner Children's Hospital of Wisconsin
General Contractor Oscar J. Boldt Construction
Architect Shepley Bulfinch Richardson and Abbot
Engineer Ring & DuChateau
Man-hours 38,699.00
Date Completed September 2008

Advanced Healthcare ~ Medical MRI Suite

Description HVAC, fire protection, plumbing
Owner Advanced Healthcare
General Contractor CG Schmidt
Architect Welman Architects
Engineer Grunau Company
Man-hours 4,240.00
Date Completed August 2008

Harley Davidson Museum

Harley Davidson Museum
Description Specialty Metal Fab
Owner Harley Davidson
General Contractor M.A. Mortenson
Architect HGA
Engineer Pentagram Architecture
Man-hours 444.00
Date Completed August 2008

Northwestern Mutual ~ Franklin Phase II

Northwestern Mutual ~ Franklin Phase II
Description Design/Assist, HVAC, Plumbing, Fire Protection, Specialty Metal Fab
Owner Northwestern Mutual
General Contractor Opus
Architect Eppstein Uhen Architects
Engineer Affiliated Engineers
Man-hours 55,766.00
Date Completed August 2008

Potawatomi Bingo Casino Expansion

Potawatomi Bingo Casino Expansion
Description HVAC, Underground Site Utilities, Specialty Metal Fabrication, Parking Deck
Owner Forest County Potawatomi Community
General Contractor Gilbane Building Company
Architect Hnedak BoBo Group
Man-hours 40,783.00
Date Completed August 2008

Marquette University, Mashuda Dorm

Marquette University, Mashuda Dorm
Description Fire Protection Retrofit
Owner Marquette University
Engineer Grunau Company
Man-hours 4,820.00
Date Completed July 2008

Hampton Inn & Suites, West Bend

Description Design/Build, Fire Protection
Owner Hampton Inn & Suites
General Contractor American Design Build
Architect American Design Build
Engineer Grunau Company
Man-hours 951.00
Date Completed May 2008

Mayfair Woods Business & Technology Center

Description Design/Build, HVAC; LEED CS Silver rating in 2008
Owner Irgens Development
General Contractor C.G. Schmidt, Inc.
Architect PRA
Engineer Grunau Company
Man-hours 4,722.00
Date Completed May 2008

North Oaks Condominiums

Description Design/Build, Fire Protection
General Contractor GE Properties
Architect Douglas Gallus
Engineer Grunau Company
Man-hours 1,275.00
Date Completed May 2008

NASCAR Wind Tunnel

Description Specialty Metal Fabrication and Structural Steel
Owner Wind Shear Inc.
General Contractor JE Jacobs Technology, Inc.
Man-hours 12,996.00
Date Completed January 2008

Potawatomi Bingo & Casino Renovation

Potawatomi Bingo & Casino Renovation
Description Fire Protection - Sitework
Owner Forest County Potawatomi Community
General Contractor Titan Construction
Architect Schultz Werk Architecture
Date Completed 2007

St. Luke's Hospital Cath Lab & EP Lab Renovations

St. Luke's Hospital Cath Lab & EP Lab Renovations
Description Plumbing
Owner Aurora Health Care
General Contractor Berghammer Corporation
Architect Brubaker Architects
Engineer Ring & DuChateau
Date Completed 2007

Metavante ~ Phase II

Description HVAC: Installed PAC units in data center
Owner Metavante
Engineer Miller Engineering
Man-hours 2,878.00
Date Completed December 2007

Metavante ~ UPS System

Description HVAC: Installed UPS system in Data Center
Owner Metavante
Engineer Miller Engineering
Man-hours 1,676.00
Date Completed December 2007

Jewish Home & Care Center

Jewish Home & Care Center
Description Design/Build HVAC & Plumbing - Plumbing Replacement
Owner Jewish Home & Care Center
General Contractor VJS Construction Services
Architect Zimmerman Design Group
Engineer Grunau Company
Man-hours 20,672.00
Date Completed November 2007

Recycling Education Center, City of Milwaukee

Description Geothermal system with (4) heat pumps, (5) circulating and zone pumps, (12) 300 feet deep wells and fused piping
Owner City of Milwaukee
Engineer Frederickson Engineering
Man-hours 918.00
Date Completed November 2007

Columbia St. Mary's ~ Ozaukee

Columbia St. Mary's ~ Ozaukee
Description HVAC, Temperature Controls (Electrical)
Owner Columbia St. Mary's
General Contractor M.A. Mortenson Company
Architect HOK
Engineer Ring & DuChateau
Man-hours 30,349.00
Date Completed July 2007

Northlawn Veterans Housing Complex

Description Plumbing
Owner City of Milwaukee
General Contractor Grunau Company
Engineer Environmental Engineering Section of Department of Public Works
Man-hours 250.00
Date Completed July 2007

Penske Truck Leasing

Description Plumbing
Owner Penske Truck
General Contractor Schuh Construction
Engineer Graef Anhalt Schloemer
Man-hours 1,961.00
Date Completed June 2007

University Club Tower

University Club Tower
Description Specialty Metal Fabrication work in multi-use building including condominiums, guest suites, health club, and dining facilities.
Owner University Club, LLC
General Contractor J.H. Findorff & Son, Inc.
Architect Skidmore, Owings and Merrill, LLP
Man-hours 7,721.00
Date Completed June 2007

Manpower Corporate Headquarters

Manpower Corporate Headquarters
Description Design/Build, HVAC, Plumbing, Fire Protection, Underground Site Utilities, Temperature Controls (Electrical), Specialty Metal Fab; LEED NC Gold Rating in 2009
Owner Riverbend Place LLC
General Contractor Gilbane Building Co.
Architect Eppstein Uhen Architects
Engineer STS Consultants
Man-hours 28,721.00
Date Completed May 2007

Advanced Healthcare ~ Corporate Headquarters

Advanced Healthcare ~ Corporate Headquarters
Description Design/Build, HVAC, Temperature Controls (Electrical)
Owner Advanced Healthcare
General Contractor Midwest Design & Development
Engineer Grunau Company
Date Completed April 2007

Taylor Woods, Water Boosting Station

Description Sitework, Plumbing, HVAC
Owner Village of Menomonee Falls
General Contractor Sonag Company
Architect Clark Dietz, Inc.
Engineer Clark Dietz, Inc.
Man-hours 700.00
Date Completed April 2007

MCW/CRI Biomedical Research Facility

MCW/CRI Biomedical Research Facility
Description HVAC, Plumbing and Medical Gas for Laboratories and Vivarium
Owner MCW/CRI
General Contractor Gilbane Building Co.
Architect HGA
Engineer BR+A
Man-hours 194,148.00
Date Completed January 2007

Flint Hills Resources

Flint Hills Resources
1000-gallon foam storage tank which supplies AFFF to extinguish fires
Description Fire Protection
General Contractor Burns McDonnell
Architect Burns McDonnell
What Our Customers Say The fire protection system at the Flint Hills Resources Milwaukee Terminal offered some unique challenges to Grunau, and they performed exceptionally at every turn. The site restrictions and customer expectations could not have been any higher, and the Grunau personnel rose above the restrictions and led the effort to complete, commission, and train the Owner on a system that they were not familiar with. Performance specifications can often prove difficult with subcontractors that are not familiar with a design-build firm, but Grunau provided excellent services and delivered on their promise. It was a pleasure to have the opportunity to work with Eric Radke and the good people at Grunau. Eric Kirchhofer, Project Manager Burns McDonnell
Date Completed December 2006

Prospect Medical Commons

Prospect Medical Commons
Description Design/Assist HVAC Including Further Development of Current Design
Owner Irgens Development, LLC for Columbia St. Mary's
General Contractor C.G. Schmidt, Inc.
Architect HOK
Engineer Affiliated Engineers
Man-hours 11,645.00
Date Completed December 2006

U-Haul Storage

Description Design/Build, Fire Protection
General Contractor Seasafe Company
Architect Archicon Canada, Inc.
Engineer Marshris Engineering
Man-hours 1,245.00
Date Completed December 2006

Blood Center of Wisconsin

Blood Center of Wisconsin
Description Sitework & Fire Protection
Owner Blood Center Research Institute
General Contractor M.A. Mortenson
Architect HGA
Date Completed November 2006

McAdams Graphics

Description Sitework & Plumbing
Owner McAdams Graphics
General Contractor Titan Construction
Engineer Grunau Company & National Survey
Date Completed November 2006

Carma Distribution Facility & Warehouse

Carma Distribution Facility & Warehouse
Description Design/Build Fire Protection, Plumbing & HVAC - Sitework
Owner Carma Labs
General Contractor J.H. Findorff & Sons
Engineer Grunau Company
Date Completed October 2006

Alverno College

Description Structural & Miscellaneous Metals, Plumbing, Underground Site Utilities for a new parking structure and campus renovations
Owner Alverno College
General Contractor Gilbane Building Co.
Architect Uihlein Wilson Architects
Date Completed September 2006

Discovery World

Discovery World
Description Miscellaneous Metals and Structural Steel at Amphitheater Over Water
Owner Discovery World, Ltd.
General Contractor Gilbane Building Co.
Architect HGA
Engineer HGA
Man-hours 16,971.00
Date Completed September 2006

Badger Meter

Description Process piping & specialty metal fabrication teams completed a new production test line that checks accuracy
Owner Badger Meter
General Contractor Grunau Company
Architect Arnold & O'Sheridan
Engineer Grunau Company
Date Completed August 2006

Fort Memorial Hospital

Fort Memorial Hospital
Description HVAC, Plumbing, Sitework for 116,000 sf Addition and 51,000 sf Remodel
Owner Fort Health Care
General Contractor JP Cullen & Sons
Architect Plunkett Raysich Architects
Engineer Affiliated Engineers
Date Completed August 2006

UWM - Kenilworth Building

UWM - Kenilworth Building
Description HVAC for 400,000 sf Redevelopment of Existing Concrete Structure. Multi-use Housing, University Classrooms and Retail Space.
Owner Weas Development for the UW - Milwaukee
General Contractor KBS Construction
Architect HGA
Engineer Grunau Company
Man-hours 28,991.00
Date Completed August 2006

Potawatomi Bingo & Casino Site Utility Relocations

Potawatomi Bingo & Casino Site Utility Relocations
Description Relocate Domestic Water, Fire Protection Services, Sanitary & Storm Sewer Connections
Owner Forest County Potawatomi Community
General Contractor Gilbane Building Co.
Architect Hnedak BoBo Group
Date Completed July 2006

211 West Wisconsin Avenue

Description Fire Protection, Plumbing, Underground Site Utilities
General Contractor Berghammer Corporation
Architect Eppstein Uhen Architects
Date Completed June 2006

Cenergy - Bucyrus International

Cenergy - Bucyrus International
Description HVAC System Upgrade
Owner Bucyrus International
Engineer CEnergy/Grunau
Man-hours 12,505.50
Date Completed January 2006

GE Medical Health Center & Research Park

GE Medical Health Center & Research Park
Description Design/Build, HVAC
Owner Irgens Development
General Contractor C.G. Schmidt, Inc.
Architect Eppstein Uhen Architects
Engineer Grunau Company
Date Completed January 2006

Hyatt Ballroom

Description Fire Protection
Architect Zimmerman Design Group
Man-hours 980.00
Date Completed January 2006

Jones Island WWTP

Description Instrumentation and HVAC Upgrades
Owner MMSD
General Contractor Staff Electric
Engineer CDM
Date Completed January 2006

Jones Island WWTP

Description Instrumentation and HVAC Upgrades
Owner MMSD
General Contractor Staff Electric
Engineer CDM
Man-hours 4,479.00
Date Completed January 2006

Milwaukee Academy of Science

Description Fire Protection, Plumbing at Charter School
Owner Milwaukee Science Education Consortium
Architect Eppstein Uhen Architects
Man-hours 1,822.00
Date Completed January 2006

Marquette University Schroeder Hall

Description Fire Protection
General Contractor KBS Construction
Architect HGA
Man-hours 2,428.00
Date Completed December 2005

Pier Wisconsin

Description Site Utilities
Owner Pier Wisconsin LTD
Architect HGA
Engineer HGA
Date Completed December 2005

Korean Church

Description Site Utilities, Design-Build, Plumbing for New Church
Owner Korean Church of Milwaukee
General Contractor Beyer Construction
Architect Workshop Architects
Man-hours 2,190.00
Date Completed November 2005

Prairie School

Description HVAC, Plumbing, Fire Protection
General Contractor Bukacek Construction, Inc
Architect Zimmerman Design Group
Engineer Grunau Company
Man-hours 12,262.00
Date Completed November 2005

Cudahy

Description Pipe bursting for the City of Cudahy
Owner City of Cudahy
General Contractor Grunau Company
Engineer City of Cudahy Engineering Department
Man-hours 1,280.00
Date Completed September 2005

HGA

Description Design/Build, HVAC Underfloor System
Owner Mandel Group
General Contractor J.H. Findorff
Architect HGA
Engineer Grunau Company
Man-hours 2,723.00
Date Completed September 2005

Aurora Medical Center ~ Hartford Hospital

Description HVAC and Plumbing for radiology addition and surgery suite remodel
Owner Aurora Medical Center
General Contractor MAC
Architect Plunkett Raysich Architects
Engineer Ring & Duchateau
Date Completed June 2005

API Software

API Software
Description Design/Build, HVAC, Plumbing, Underground Site Utilities for Hartford office building
Owner API Software
General Contractor KBS Construction
Architect Excel
Engineer Grunau Company
Date Completed May 2005

Aurora Health Care ~ Computer Room Expansion

Description In a 2-phase computer room expansion project at Aurora Health Care's corporate facility, Grunau installed a new glycol cooler system, fire suppression system, UPS unit and generator, plus Specialty Metals work including rooftop platforms, catwalks, railings and stairs. - View Case Study
Owner Aurora Health Care
General Contractor Grunau Company
Architect Grunau Company
Engineer Grunau Company
Date Completed May 2005

P&H Mining Upgrade

Description HVAC System Upgrade
Owner P&H Mining
General Contractor Cenergy Systems
Date Completed May 2005

St. Luke's Medical Center Histology

Description HVAC, Plumbing, Fire Protection
Owner Aurora - St. Luke's
General Contractor Boldt Construction
Architect Brubaker
Engineer Ring & DuChateau
Date Completed May 2005

Thomson Beta

Description HVAC, Plumbing, Fire Protection, Special Hazards
Owner Thomson Beta
General Contractor Opus Corporation
Architect Eppstein Uhen
Engineer Affiliated Engineers
Date Completed April 2005

Roundy's Distribution Center

Description HVAC and Plumbing
Owner Pabst Farms
Architect Opus & A&E
Engineer Grunau Company
Man-hours 16,427.00
Date Completed March 2005

Marquette University Memorial Library

Description HVAC remodel of 50-year old library, design/build project
Owner Marquette University
General Contractor Opus North Corporation
Architect Opus & A&E
Engineer Grunau Company
Date Completed December 2004

VA ESPC

Description Decentralize Steam Plant
Owner VA Medical Center
General Contractor Johnson Controls
Engineer Grunau Company
Date Completed November 2004

Marquette University Parking Structure

Description Fire Protection
Owner Marquette University
General Contractor Opus North Corporation
Architect Opus North Corporation
Engineer Opus North Corporation
Date Completed August 2004

Northwestern Mutual ~ Franklin Campus ~ Grunau Metals

Description Specialty metals fabrication of railings and stairs; also completed HVAC and plumbing; see separate Mechanicals Project entry to read the mechanical case study - View Case Study
Owner Northwestern Mutual
General Contractor Opus North Corporation
Architect Eppstein Uhen Architects
Engineer Affiliated Engineers
Date Completed April 2004
Northwestern Mutual ~ Franklin Campus ~ Grunau Metals
Photo Courtesy of Northwestern Mutual. Copyright 2004
Northwestern Mutual ~ Franklin Campus ~ Grunau Metals
Northwestern Mutual ~ Franklin Campus ~ Grunau Metals

Northwestern Mutual ~ Franklin Campus ~ Mechanicals

Description HVAC, plumbing, and also completed speciaty metals fabrication of handrails and stairs; see separate Grunau Metals Project entry to read that case study - View Case Study
Owner Northwestern Mutual
General Contractor Opus North Corporation
Architect Eppstein Uhen
Engineer Affiliated Engineers
Date Completed April 2004
Northwestern Mutual ~ Franklin Campus ~ Mechanicals
Photo Courtesy of Opus North
Northwestern Mutual ~ Franklin Campus ~ Mechanicals
Northwestern Mutual ~ Franklin Campus ~ Mechanicals
Photo courtesy of Northwestern Mutual. Copyright 2004

St. Luke's Hospital Central Plant

Description HVAC
Owner Aurora Health Care
General Contractor Boldt Construction
Architect Kahler Slater
Engineer Ring & DuChateau
Man-hours 15,694.00
Date Completed April 2004

Marquette University McGuire Center

Description Plumbing, HVAC, Fire Protection
Owner Marquette University
General Contractor Opus North Corp
Architect Opus North Architects
Engineer Grunau Company
Man-hours 21,171.00
Date Completed March 2004

MSOE

Description Service and maintenance - Hot water storage tank maintenance
Owner MSOE
Date Completed March 2004

Riley Construction

Riley Construction
Photo Courtesy of Riley Construction
Description Stairs and railings, Specialty metal fabrication at Edward Bain School of Language and Art - View Case Study
Owner Kenosha Unified School District #1
General Contractor Riley Construction
Architect Bray Associates Architects
Engineer Ambrose Engineering, Inc.
What Our Customers Say "Grunau Metals did a great job. They made sure we had permanent stairs as soon as the second floor was erected - the way it should be done." Tom Riley, President - Riley Construction
Date Completed March 2004

St. Luke's Heart Care Center and Patient Tower

St. Luke's Heart Care Center and Patient Tower
Description HVAC work for a new cardiac center and patient tower - View Case Study
Owner Aurora Health Care
General Contractor Boldt Construction
Architect Kahler Slater Architects
Engineer Ring & DuChateau
Date Completed March 2004

Wisconsin Heart Hospital

Description HVAC and Plumbing
General Contractor Mortenson
Architect HDR
Engineer HDR
Date Completed January 2004

E-Funds

Description Tenant HVAC build-out
Owner Liberty Property
General Contractor Berghammer Corporation
Architect Zimmerman Design Group
Engineer Grunau Company
Date Completed 2004

St. John's Cathedral

St. John's Cathedral
Description AHUs, Chillers
Owner Archdiocese of Milwaukee
General Contractor GPD | Gilbane
Architect Hammel, Green and Abrahamson
Engineer Hammel, Green and Abrahamson
Man-hours 4,103.25
Date Completed 2003

Miller Brewing Company - Humidifier Pan Repair

Description Service and maintenance - Grunau Company's service and maintenance team was hired by Miller Brewing Company to repair an HVAC unit's humidifier pan. - View Case Study
Owner Miller Brewing Company
What Our Customers Say "Grunau not only identified the problem of this badly corroded humidifier pan, but also suggested this cost effective and durable solution to what might have been a difficult replacement. It is innovative contributions like this that help solidify our partnership with Grunau." Tom Blaedon, Corporate Facilities Manager - Miller Brewing Company
Date Completed December 2003
Miller Brewing Company - Humidifier Pan Repair
Miller Brewing Company - Humidifier Pan Repair

Milwaukee Theatre

Description Staircases, Catwalks, Platforms, Specialty metal fabrication - View Case Study
General Contractor GPD/Gilbane, Hunt
Architect VOA Associates
Engineer Nayyar & Nayyar Structural Engineers
Date Completed November 2003
Milwaukee Theatre
Photo courtesy of Steinkamp-Ballogg Photography
Milwaukee Theatre
Photo courtesy of Steinkamp-Ballogg Photography
Milwaukee Theatre
Photo courtesy of Steinkamp-Ballogg Photography

BioGenesis Enterprises, Inc.

Description Engineering services and Specialty Metal Fabrication for soil and sediment washing machines - View Case Study
Owner BioGenesis Enterprises, Inc.
Engineer Grunau Metals and BioGenesis
What Our Customers Say We chose Grunau Metals because they're not a typical subcontractor. Instead, they are partners in our projects, helping us overcome the challenges and celebrating the successes. That's the kind of cooperation and dedication we need. ~ Masood Amiran, BioGenesis Enterprises, Inc.
Date Completed August 2003
BioGenesis Enterprises, Inc.
BioGenesis Enterprises, Inc.
BioGenesis Enterprises, Inc.

GE Medical Systems

Description HVAC, Plumbing
Owner GE Medical Systems
General Contractor Jansen Group
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed July 2003

Stark Investments

Description Plumbing, HVAC, Fire protection
Owner Stark Investments
General Contractor Jansen Group
Engineer Grunau, Ring & DuChateau
Date Completed July 2003

St. Luke's Hospital - Platform fabrication

Description Specialty metal fabrication, Platform fabrication for equipment installation - View Case Study
Owner Aurora Health Care
Date Completed June 2003

Honeycreek IV Corporate Center

Description Plumbing, HVAC
Owner Opus North Corporation
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Date Completed May 2003

Raynor Memorial Library

Description Engineering services, HVAC, Plumbing, Fire protection, Specialty metal fabrication
Owner Marquette University
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Man-hours 16,941.74
Date Completed May 2003
Raynor Memorial Library
Raynor Memorial Library
Raynor Memorial Library

Wells Fargo

Description Service and maintenance - Rooftop air conditioning unit replacement - View Case Study
Owner Wells Fargo
What Our Customers Say "Grunau thought of an innovative way to complete this unique and complex project while respecting the businesses around our building. They were up to the challenge and really came through for Wells Fargo." Bryant Carter, Service Technician - Wells Fargo
Date Completed May 2003
Wells Fargo
Photo Courtesy of Wells Fargo
Wells Fargo
Photo Courtesy of Wells Fargo
Wells Fargo
Photo Courtesy of Wells Fargo

School Sisters of St. Francis

Description Engineering services, HVAC
General Contractor Voss Jorgensen Schueler
Architect Eppstein Uhen
Engineer Grunau Company
What Our Customers Say "We are grateful for friends like you who support our mission." Christine Burke-Duecker, Director of Development - School Sisters of St. Francis
Date Completed February 2003
School Sisters of St. Francis
School Sisters of St. Francis

Waukesha Memorial Hospital

Description HVAC, Temperature controls
Owner Waukesha Memorial Hospital
General Contractor CG Schmidt
Architect Engberg Andersen
Engineer Engineering Concepts
Date Completed February 2003

Lakeland Medical Center

Description HVAC
Owner Aurora Health Care
General Contractor Grunau Company
Architect Arnold & O'Sheridan
Engineer Arnold & O'Sheridan
Date Completed January 2003

St. Mary's Hospital - Ozaukee Expansion/Remodel

St. Mary's Hospital - Ozaukee Expansion/Remodel
Description HVAC, Plumbing
Owner Columbia St. Mary's
General Contractor Mortenson
Architect Kahler Slater
Engineer Ring & DuChateau
Man-hours 57,915.51
What Our Customers Say "I just wanted to take a moment to thank you for the expertise and experience that you have brought to the project. Your ability, and the abilities of your team members, has been instrumental in identifying many conflicts and issues for construction." Cindy Finstad, Project Manager - Mortenson
Date Completed January 2003

Permacel

Description Equipment setting, process piping, ductwork, and specialty metal fabrication for new special adhesive manufacturing facility
Owner Nitto Denko
General Contractor Grunau Company
Engineer Nitto Denko
Man-hours 47,522.00
Date Completed December 2002
Permacel
Permacel

Henri's Foods ~ Germantown Relocation

Description CIP and utility piping for salsa and tomato paste food processing lines
Owner Unilever Best Foods
Architect Ambitech
Date Completed November 2002

Honda - Hot/Cold Chamber II

Description Circuit Ducting
Owner Honda
Date Completed October 2002

Miller Brewing Company Filter #4

Miller Brewing Company Filter #4
Description Set equipment, installed process piping and controls
Owner Miller Brewing Company
Man-hours 6,799.00
Date Completed September 2002

Army Aviation Support Facility ~ West Bend Hanger

Description Plumbing, Fire Protection
Owner State of Wisconsin
General Contractor Sonag Company, Inc.
Architect Earth Tech
Engineer PSJ Engineering
Date Completed August 2002

Johnson Building

Description Canopies, Stairwells, Railings, Specialty Metal Fabrication for bank and office space - View Case Study
Owner Johnson Bank
General Contractor Mortenson
Architect Eppstein Uhen Architects
Engineer Pierce Engineers
Man-hours 16,398.50
What Our Customers Say The Johnson Building is a reflection of how Grunau Metals consistently does business: focused on quality and respectful of our budget. It wasn't a surprise that the team did a great job. ~ Scott Weas, Owner's Representative for Johnson Bank - Weas Development
Date Completed August 2002
Johnson Building
Courtesy of Johnson Bank
Johnson Building
Courtesy of Johnson Bank

Marquette University Dental School

Marquette University Dental School
Description Plumbing, HVAC, Medical gas system
Owner Marquette University
General Contractor Boldt Construction
Architect Kahler Slater
Engineer Arnold & O'Sheridan
Man-hours 39,047.65
Date Completed August 2002

Toyota - Princeton, Ind.

Description Structural steel
Owner Toyota
Date Completed July 2002

Boston Store Remodel

Description HVAC, Plumbing, Specialty metal fabrication, Parking and chiller plant upgrade for remodeled tenant building
Owner Wispark LLC
General Contractor GPD/Gilbane
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed June 2002

Milwaukee Art Museum

Milwaukee Art Museum
Description Engineering services, Plumbing, Sitework, Water feature
Owner Milwaukee Art Museum
General Contractor CG Schmidt
Man-hours 11,465.00
What Our Customers Say "I cannot tell you how impressed we were with the commitment and service from each and every one of your staff. Due to your outstanding efforts, Milwaukee now has what is clearly a world-class facility." Steven G. Chamberlain, President - CG Schmidt, Inc.
Date Completed 2001

Dynacare/Froedtert

Description Specialty metal fabrication, Structural steel, Stairs, Handrails
Date Completed December 2001

Edison School

Description Installed high efficiency boilers
Owner Edison School
General Contractor GPD/Gilbane
Engineer Grunau Company
Date Completed October 2001

Runzheimer International ~ Headquarters

Description Engineering services, HVAC
Owner Runzheimer International
General Contractor Berghammer Corporation
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed October 2001

Bombardier

Description Process exhaust, specialty metal fabrication
Owner Bombardier
General Contractor Axor, Inc.
Architect Arnold & O'Sheridan
Engineer Arnold & O'Sheridan
Date Completed September 2001

Central City Cyberschool of Milwaukee

Description Plumbing, Site utilities, Fire protection, HVAC
Owner Milwaukee County
General Contractor Stevens Construction
Architect Adrian Guszkowski
Engineer RJ Miller, Adrian Guszkowski
Date Completed September 2001

St. Francis Hospital

Description 1200 ton centralized chilled water system
Owner Covenant Healthcare
General Contractor Johnson Controls
Engineer Grunau Company
Date Completed August 2001

Honeycreek III Corporate Center

Description Engineering services, HVAC
Owner Opus North Corporation
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Date Completed June 2001

Time Warner Cable

Time Warner Cable
Description Engineering services, HVAC, Plumbing, Fire Protection for Time Warner Cable's offices
Owner Wisconsin Electric
General Contractor GPD/Gilbane
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed June 2001

Vince Lombardi Cancer Clinic

Description HVAC
Owner Aurora, Hammes
General Contractor Mortenson
Engineer Albert Kahn Associates
Date Completed June 2001

Ivory Tusk

Description Structural steel, Stairs, Specialty metal fabrication
Date Completed May 2001

Wisconsin Probation and Parole Facility

Description Specialty metal fabrication, Stairs, Railings
Owner State of Wisconsin
Man-hours 7,772.00
Date Completed May 2001
Wisconsin Probation and Parole Facility
Wisconsin Probation and Parole Facility

Marquette University Todd Wehr Chemistry Building

Marquette University Todd Wehr Chemistry Building
Description New central supply air/exhaust systems, Plumbing to hoods, Fixtures and lab counter spaces
Owner Marquette University
General Contractor Jens Construction
Architect Holabird & Root
Engineer Affiliated Engineers
Date Completed April 2001

401 Woodland Prime

401 Woodland Prime
Description HVAC, Plumbing
Owner Weas Development
Date Completed January 2001

DTF Tunnel #8

Description Wind Tunnel
Date Completed January 2001

500 Woodland Prime

Description Plumbing, HVAC for a 3-story 120,000 sq ft office building
Owner Weas Development
General Contractor Jansen Company
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed December 2000

Miller Brewing Company I-House

Description Process piping
Owner Miller Brewing Company
General Contractor GPD/Gilbane
Engineer Jacobs Engineering
Date Completed December 2000

Potawatomi Bingo Casino

Description Plumbing, Fire protection, HVAC, Specialty metal fabrication, Snow melt system
Owner Forest County Executive Council-Gaming Commission
General Contractor Sverdrup, CG Schmidt
Architect Graef, Anhalt, Schloemer
Engineer Ring & DuChateau
Date Completed December 2000
Potawatomi Bingo Casino
Potawatomi Bingo Casino
Potawatomi Bingo Casino

St. Luke's Hospital Vertical Expansion

Description Fire protection, HVAC for four floor addition
Owner Aurora Health Care
General Contractor Oscar J. Boldt Construction
Architect Welman Architects
Engineer Ring & DuChateau
Date Completed December 2000

Roosevelt Middle School

Description Structural steel
Date Completed November 2000

Marquette University East Hall Renovation

Marquette University East Hall Renovation
Description Plumbing, Fire protection, HVAC
Owner Marquette University
General Contractor Hunzinger Construction
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed September 2000

Wisconsin State Fair Park Renovations

Description Engineering services, Plumbing, HVAC
Owner State of Wisconsin
General Contractor Hunzinger Construction
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed September 2000

Edison School ~ Remodeling

Description Plumbing, fire protection, and HVAC for 95,000 sq. ft. remodeling
Owner Milwaukee County
General Contractor GPD/Gilbane
Engineer Grunau Company
Date Completed August 2000

Honeycreek II Corporate Center

Honeycreek II Corporate Center
Description Engineering services, HVAC
Owner Opus North Corporation
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Date Completed August 2000

DTF, Allen Park, Mich.

Description Fab/Install Wind Tunnel
Date Completed March 2000

William F. Eisner Museum of Advertising and Design

Description Fab/Install Specialty metal fabrication, Structural steel
Date Completed March 2000

Water and Wells Streets

Water and Wells Streets
Description Fab/Install, Specialty metal fabrication, Stairs, Handrails, Canopy, Railings
Date Completed February 2000

Alternative Living Services ~ Corporate Headquarters

Alternative Living Services ~ Corporate Headquarters
Description Plumbing, HVAC, Underground Site Utilities
Owner ALS
General Contractor Hunzinger Construction
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed January 2000

Third Ward Parking Structure

Third Ward Parking Structure
Description Specialty metal fabrication, handrails
Date Completed 2000

Financial Technology Services Company

Description Chiller and pump system installation - View Case Study
What Our Customers Say "Grunau Company really worked around our needs when completing this project," said a company representative. "Grunau's dedication to their clients is evident in the way they conduct business."
Date Completed November 1999

Whitewater Middle School Hot Water Boilers

Whitewater Middle School Hot Water Boilers
Description Electrical, Control wiring, HVAC
Owner Whitewater Unified School District
General Contractor Johnson Controls
Date Completed November 1999

Potawatomi Bingo Casino

Potawatomi Bingo Casino
Description Stairs, Specialty metal fabrication
Owner Forest County Executive Council-Gaming Commission
Date Completed October 1999

Medical College of Wisconsin Health Research Center

Medical College of Wisconsin Health Research Center
Description HVAC
Owner Medical College of Wisconsin
General Contractor Mortenson
Date Completed June 1999

Downtown Milwaukee YMCA Branch Relocation

Description Engineering services, Plumbing, HVAC, AHU pipe/duct connection at track
Owner Trammell Crow
General Contractor CG Schmidt
What Our Customers Say "We are proud of the outcome and Grunau had a lot to do with its success!" Richard J. Nierzwicki, Vice President of Operations - CG Schmidt, Inc.
Date Completed February 1999
Downtown Milwaukee YMCA Branch Relocation
Downtown Milwaukee YMCA Branch Relocation

Alverno College ~ Technology Center

Description Plumbing, HVAC, Specialty Metal Fabrication
Owner Alverno College
General Contractor GPD/Gilbane
Date Completed January 1999
Alverno College ~ Technology Center
Alverno College ~ Technology Center
Alverno College ~ Technology Center

Aurora Health Care Center ~ Kenosha

Aurora Health Care Center ~ Kenosha
Description HVAC
Owner Aurora Health Care
General Contractor Mortenson
Date Completed January 1999

Howard Avenue Water Purification Plant

Howard Avenue Water Purification Plant
Description HVAC, Site plumbing, Process piping, Specialty metal fabrication, Control wiring, Large diameter underground piping
Owner City of Milwaukee
General Contractor BVCI, JSA
Date Completed July 1998

Kenosha County Correctional Facility

Kenosha County Correctional Facility
Description Plumbing
Owner Kenosha County
General Contractor Camosy Construction
Date Completed July 1998

Linwood Water Purification Plant

Linwood Water Purification Plant
Description HVAC, Plumbing, Process piping, Specialty metal fabrication, Control wiring, Large diameter underground piping
Owner City of Milwaukee
General Contractor BVCI, JSA
Date Completed July 1998

Sinai Samaritan Medical Center Campus Consolidation

Sinai Samaritan Medical Center Campus Consolidation
Description HVAC, Plumbing
Owner Sinai Samaritan Medical Center
General Contractor GPD/Gilbane
What Our Customers Say Your field forces were some of the most competent individuals I've ever seen. [They] went way beyond the normal effort required to make a complex mechanical project successful. ~ Gene Hult, General Superintendent, Gilbane
Date Completed July 1998

M&I Data Systems

M&I Data Systems
Description HVAC, Specialty metal fabrication
Owner M&I Bank
General Contractor Oscar J. Boldt Construction
Date Completed June 1997

SC Johnson ~ Worldwide Headquarters

Description HVAC
Owner SC Johnson Worldwide
General Contractor Mortenson, Riley Construction
Date Completed May 1997

McKinley Marina

McKinley Marina
Description Demolition and installation of new fuel, sanitary, fire, water and electrical systems
Owner Milwaukee County Department of Public Works, Milwaukee County Parks
Date Completed May 1996

Vilter Manufacturing

Vilter Manufacturing
Description HVAC for 56,000 sq. ft. addition
Owner Vilter Manufacturing
General Contractor Klug & Smith Company
Date Completed April 1996
Grunau Logo 2
Nuvo Construction Company, Inc. would like to offer sincere appreciation to the entire staff of the Grunau Company for their hard work, timeliness, and extension of services above and beyond what was required in recent projects. Grunau Company and its employees have been an asset to the success of many of our projects, and will continue to be considered as a primary support in the future success of Nuvo Construction Company, Inc.”
- Scott Farina, Project Manager at Nuvo Construction Company, Inc.
more »