Projects
Services: Fire protection
Grunau has installed and serviced fire suppression systems across various industries including power plants, warehouses, academic buildings, industrial spaces and more. View our projects to learn more about the wide range of fire protection solutions we offer including clean agent fire suppression systems, pre-action systems, deluge, and wet pipe fire protection systems.
OH ~ Cardinal Power Plant
| Description |
Replaced old CO2 fire suppression system with a double interlock preaction fire protection system around coal pipes at coal-fired power plant |
| Owner |
Cardinal Power Plant |
| What Our Customers Say |
Project Manager Jack Carney and the Grunau team are a real class act and were great to work with. ~ Doug Van Nuys, Fire Protection Supervisor at Cardinal |
| Date Completed |
July 2011 |
OH ~ W.H. Sammis Power Plant
Fire protection discharge test at Sammis after emergency install of new transformer
| Description |
Deluge protection system for industrial transformer at coal-fired power plant |
| Owner |
W.H. Sammis Power Plant |
| Date Completed |
January 2011 |
FL ~ Peabody Hotel
| Description |
Installed sprinklers in new 34 story hotel and 2-story convention center; installed 2 new fire pumps underground per the fire proteciton drawings |
| Owner |
Peabody Hotel |
| General Contractor |
Balfour Beatty Construction |
| Date Completed |
November 2010 |
Advanced Healthcare ~ Mequon
| Description |
Design/Build, Plumbing, HVAC, Fire Protection, Medical Gas |
| Owner |
Advanced Healthcare |
| General Contractor |
CG Schmidt |
| Architect |
Welman Architects |
| Engineer |
Grunau Company |
| Man-hours |
11,782.00 |
| Date Completed |
January 2010 |
Westbrook Corporate Center
| Description |
Fire Protection |
| Owner |
Burke Properties |
| General Contractor |
Berghammer |
| Architect |
Stephen Perry Smith |
| Man-hours |
2,514.00 |
| Date Completed |
January 2010 |
Baird ~ Training Floor
| Description |
HVAC, Fire Protection, Specialty Metal Fab |
| Owner |
US Bank / Baird Corp. |
| General Contractor |
Gilbane |
| Architect |
Gensler |
| Engineer |
Gosentini |
| Man-hours |
4,882.00 |
| Date Completed |
April 2009 |
Advanced Healthcare ~ Grafton
| Description |
HVAC, Plumbing, Fire Protection for healthcare clinic |
| Owner |
Advanced Healthcare |
| General Contractor |
Midwest Design & Development |
| Architect |
Midwest Design & Development |
| Man-hours |
8,378.00 |
| Date Completed |
December 2008 |
Marquette High School
| Description |
Design/Build HVAC, Plumbing, Fire Protection |
| Owner |
Marquette |
| General Contractor |
C.G. Schmidt |
| Architect |
Eppstein Uhen |
| Engineer |
Grunau Company |
| Man-hours |
20,477.00 |
| Date Completed |
November 2008 |
FL ~ SVP Treatment Center
| Description |
Design/Build project; Grunau designed, fabricated and installed interior wet fire sprinkler systems utilizing flexhead drops. Grunau started one foot above the finished floor. |
| Owner |
Dept of Children and Family Services |
| General Contractor |
Clark Construction Group |
| Date Completed |
September 2008 |
Advanced Healthcare ~ Medical MRI Suite
| Description |
HVAC, fire protection, plumbing
|
| Owner |
Advanced Healthcare |
| General Contractor |
CG Schmidt |
| Architect |
Welman Architects |
| Engineer |
Grunau Company |
| Man-hours |
4,240.00 |
| Date Completed |
August 2008 |
Northwestern Mutual ~ Franklin Phase II
| Description |
Design/Assist, HVAC, Plumbing, Fire Protection, Specialty Metal Fab |
| Owner |
Northwestern Mutual |
| General Contractor |
Opus |
| Architect |
Eppstein Uhen Architects |
| Engineer |
Affiliated Engineers |
| Man-hours |
55,766.00 |
| Date Completed |
August 2008 |
Marquette University, Mashuda Dorm
| Description |
Fire Protection Retrofit |
| Owner |
Marquette University |
| Engineer |
Grunau Company |
| Man-hours |
4,820.00 |
| Date Completed |
July 2008 |
Hampton Inn & Suites, West Bend
| Description |
Design/Build, Fire Protection |
| Owner |
Hampton Inn & Suites |
| General Contractor |
American Design Build |
| Architect |
American Design Build |
| Engineer |
Grunau Company |
| Man-hours |
951.00 |
| Date Completed |
May 2008 |
North Oaks Condominiums
| Description |
Design/Build, Fire Protection |
| General Contractor |
GE Properties |
| Architect |
Douglas Gallus |
| Engineer |
Grunau Company |
| Man-hours |
1,275.00 |
| Date Completed |
May 2008 |
Potawatomi Bingo & Casino Renovation
| Description |
Fire Protection - Sitework |
| Owner |
Forest County Potawatomi Community |
| General Contractor |
Titan Construction |
| Architect |
Schultz Werk Architecture |
| Date Completed |
2007 |
Manpower Corporate Headquarters
| Description |
Design/Build, HVAC, Plumbing, Fire Protection, Underground Site Utilities, Temperature Controls (Electrical), Specialty Metal Fab; LEED NC Gold Rating in 2009 |
| Owner |
Riverbend Place LLC |
| General Contractor |
Gilbane Building Co. |
| Architect |
Eppstein Uhen Architects |
| Engineer |
STS Consultants |
| Man-hours |
28,721.00 |
| Date Completed |
May 2007 |
Flint Hills Resources
1000-gallon foam storage tank which supplies AFFF to extinguish fires
| Description |
Fire Protection |
| General Contractor |
Burns McDonnell |
| Architect |
Burns McDonnell |
| What Our Customers Say |
The fire protection system at the Flint Hills Resources Milwaukee Terminal offered some unique challenges to Grunau, and they performed exceptionally at every turn. The site restrictions and customer expectations could not have been any higher, and the Grunau personnel rose above the restrictions and led the effort to complete, commission, and train the Owner on a system that they were not familiar with. Performance specifications can often prove difficult with subcontractors that are not familiar with a design-build firm, but Grunau provided excellent services and delivered on their promise. It was a pleasure to have the opportunity to work with Eric Radke and the good people at Grunau. Eric Kirchhofer, Project Manager Burns McDonnell |
| Date Completed |
December 2006 |
U-Haul Storage
| Description |
Design/Build, Fire Protection |
| General Contractor |
Seasafe Company |
| Architect |
Archicon Canada, Inc. |
| Engineer |
Marshris Engineering |
| Man-hours |
1,245.00 |
| Date Completed |
December 2006 |
211 West Wisconsin Avenue
| Description |
Fire Protection, Plumbing, Underground Site Utilities |
| General Contractor |
Berghammer Corporation |
| Architect |
Eppstein Uhen Architects |
| Date Completed |
June 2006 |
FL ~ Holmes Regional Medical Center
| Description |
Installed fire protection systems in eight-story expansion including operating room and trauma units, a foam system for the helo-port, three standpipes, and a 3,800-head sprinkler system |
| Owner |
Holmes Regional Medical Center |
| General Contractor |
Bovis Lend Lease |
| Date Completed |
January 2006 |
Hyatt Ballroom
| Description |
Fire Protection |
| Architect |
Zimmerman Design Group |
| Man-hours |
980.00 |
| Date Completed |
January 2006 |
Milwaukee Academy of Science
| Description |
Fire Protection, Plumbing at Charter School |
| Owner |
Milwaukee Science Education Consortium |
| Architect |
Eppstein Uhen Architects |
| Man-hours |
1,822.00 |
| Date Completed |
January 2006 |
Prairie School
| Description |
HVAC, Plumbing, Fire Protection |
| General Contractor |
Bukacek Construction, Inc |
| Architect |
Zimmerman Design Group |
| Engineer |
Grunau Company |
| Man-hours |
12,262.00 |
| Date Completed |
November 2005 |
FL ~ Kennedy Space Center, Shuttle Launch Pads A and B
| Description |
Retrofitted fire protection systems, including preaction, a fixed water spray system in tunnels leading to the launch pads, and adjusted PRV sprinklers to tie into high pressure underground extinguishing system |
| Owner |
NASA |
| General Contractor |
Ivey's Construction |
| Date Completed |
August 2005 |
IN ~ Carmel High School Freshman Center
| Description |
Installed fire protection systems in new freshman facility, including a fire pump, standpipes, five sprinkler systems and 2,000 feet of underground water mains |
| Owner |
Carmel Clay School Corporation |
| General Contractor |
The Skillman Corporation (Construction Manager) |
| Architect |
Fanning/Howey Associates |
| Engineer |
Fanning/Howey Associates |
| Date Completed |
August 2005 |
Aurora Health Care ~ Computer Room Expansion
| Description |
In a 2-phase computer room expansion project at Aurora Health Care's corporate facility, Grunau installed a new glycol cooler system, fire suppression system, UPS unit and generator, plus Specialty Metals work including rooftop platforms, catwalks, railings and stairs. - View Case Study |
| Owner |
Aurora Health Care |
| General Contractor |
Grunau Company |
| Architect |
Grunau Company |
| Engineer |
Grunau Company |
| Date Completed |
May 2005 |
St. Luke's Medical Center Histology
| Description |
HVAC, Plumbing, Fire Protection |
| Owner |
Aurora - St. Luke's |
| General Contractor |
Boldt Construction |
| Architect |
Brubaker |
| Engineer |
Ring & DuChateau |
| Date Completed |
May 2005 |
FL ~ Disneyland Soarin Over California
| Description |
Installed a fire protection system for Disney's theme park attraction of a simulator ride. Blended sprinklers into the scenes and background of the ride. |
| Owner |
Walt Disney World |
| General Contractor |
PCL Construction |
| Date Completed |
April 2005 |
Thomson Beta
| Description |
HVAC, Plumbing, Fire Protection, Special Hazards |
| Owner |
Thomson Beta |
| General Contractor |
Opus Corporation |
| Architect |
Eppstein Uhen |
| Engineer |
Affiliated Engineers |
| Date Completed |
April 2005 |
FL ~ Pinellas County Jail
| Description |
Outfitted cells and dormitory housing with fire protection systems, 750-gallons per minute fire pumps, six standpipes and a 1,500-head sprinkler system |
| Owner |
Pinellas County |
| General Contractor |
Skanska |
| Date Completed |
January 2005 |
IN ~ Allomatic Products Company
| Description |
Installed wet pipe fire protection systems, halon system, service, maintenance and inspection for systems in 2005. Maintain ongoing fire protection inspections and maintenance. |
| Owner |
Allomatic Products Company |
| Date Completed |
January 2005 |
IN ~ Artsgarden
| Description |
Designed wet pipe fire protection system to follow rounded building structure in Indiana. Grunau's Milwaukee shop fabricated piping network. Building is operated by the Arts Council of Indianapolis. |
| Owner |
Simon Malls |
| Date Completed |
January 2005 |
IN ~ Ben Davis High School
| Description |
Wet pipe fire protection systems |
| Date Completed |
January 2005 |
IN ~ Decatur Intermediate School
| Description |
Installed 1,200 fire protection sprinklers |
| Owner |
Decatur Township |
| Architect |
CSO Schenkel Shultz Architects |
| Date Completed |
January 2005 |
IN ~ Dow Agrosciences
| Description |
Inspection of wet pipe fire protection systems for research center, preaction sprinkler system, fire pump |
| Owner |
Dow Chemical Company |
| Date Completed |
January 2005 |
IN ~ Embassy Suites
| Description |
Ongoing inspections and maintenance of diesel fire pump, wet pipe fire protection system, and anti-freeze system in downtown and North locations |
| Owner |
Embassy Suites Hotels |
| Date Completed |
January 2005 |
IN ~ Emison Art Center
| Description |
Installed preaction fire protection systems in areas with non-replaceable art pieces, and installed wet pipe sprinkler systems |
| Owner |
DePauw University |
| General Contractor |
Shiel Sexton |
| Architect |
CSO Schenkel Shultz Architects |
| Engineer |
F & G Engineers, Inc. |
| Date Completed |
January 2005 |
IN ~ General Electric Plant
| Description |
Two fire pump systems (one electric, one diesel), 20 wet pipe systems, dry pipe system, foam system |
| Owner |
General Electric |
| Date Completed |
January 2005 |
IN ~ Market Tower
| Description |
Fire protection system service, inspections and maintenance of electric fire pump, two dry pipe systems, wet pipe sprinkler system, and preaction sprinkler system in 495,000 square foot office and retail complex |
| Owner |
Colliers Turley Martin Tucker |
| Date Completed |
January 2005 |
IN ~ Nordstrom
| Description |
Installed several dry pipe systems and wet pipe system |
| Owner |
Nordstrom |
| Date Completed |
January 2005 |
IN ~ One American Square
| Description |
Installed kitchen hood fire suppression system, halon system, preaction sprinkler system, two anti-freeze systems, three dry pipe sprinkler systems, wet pipe sprinkler system, and two fire pumps (one electric, one diesel). Continue to follow up with regular fire protection inspections and modifications in office complex |
| Owner |
Colliers Turley Martin Tucker |
| Date Completed |
January 2005 |
IN ~ Purdue Biomedical Building
| Description |
Installed four wet pipe sprinkler systems, 1,200 sprinkler heads, and dry standpipe fire protection |
| Owner |
Purdue University |
| General Contractor |
Kettlehut Construction, Inc. |
| Architect |
BSA LifeStructures |
| Engineer |
BSA LifeStructures |
| Date Completed |
January 2005 |
IN ~ Regis Bank Tower
| Description |
Installed two dry pipe fire protection systems, wet pipe system, three deluge systems, and electric fire pump in 2005. Maintain ongoing service, maintenance and inspections of thier fire protection system. |
| Owner |
McKnight Property Management, LLC |
| Date Completed |
January 2005 |
IN ~ Reilly Chemical Company
| Description |
Installed fire protection systems for chemical plant, two fire pumps (electric and diesel), wet and dry pipe systems, deluge tank system, foam systems, and two preaction systems in 2005. Maintain ongoing insepctions and service of their fire protection system. |
| Owner |
Reilly Industries |
| Date Completed |
January 2005 |
IN ~ Rose-Hulman Institute of Technology
| Description |
Installation of fire protection systems, including 37 wet pipe systems, five dry pipe systems, one anti-freeze system and two fire pumps (one electrical, one diesel) in 2005. Ongoing service, mainenance and inspections of their fire protection systems. |
| Owner |
Rose Hulman-Institute of Technology |
| Date Completed |
January 2005 |
IN ~ St Johns Medical Center
| Description |
Installed several wet and dry pipe fire protection systems, anti-freeze system and preaction system. Maintain ongoing inspections and service of their fire protection systems. |
| Owner |
St. Vincent Health |
| Date Completed |
January 2005 |
IN ~ State Office Building Complex
| Description |
Installed wet and dry pipe fire protection systems, two fire pumps (electric and diesel) |
| Owner |
State of Indiana |
| General Contractor |
Glenroy Construction |
| Date Completed |
January 2005 |
IN ~ U.S. Air Maintenance Aircraft Hangar
| Description |
Installed wet pipe fire protection systems, foam systems, five diesel fire pumps, deluge systems, two water storage tanks at airport hangar |
| Owner |
U.S. Air |
| Date Completed |
January 2005 |
IN ~ United Airlines Maintenance Hangars
| Description |
Installed wet pipe fire protections systems and foam systems at airport hangars |
| Owner |
United Airlines |
| Date Completed |
January 2005 |
PA ~ Alliant Foodservice
| Description |
Converted wet fire protection system to dry fire protection system. Installed a double-lock preaction system in a cooler/freezer and an Early Suppression, Fast Response (ESFR) wet system for dry storage |
| Owner |
Alliant Foodservice |
| General Contractor |
Environmental Structures |
| Date Completed |
January 2005 |
PA ~ Biomedical Science Tower - University of Pittsburgh
| Description |
Installed wet and dry fire protection systems including two preaction systems and two clean agent fire suppression systems in a new 10-story biomedical science building on the University campus |
| Owner |
University of Pittsburgh |
| General Contractor |
Mascaro/Hunt |
| Date Completed |
January 2005 |
PA ~ JC Williams Hall & St Thomas More Hall at Franciscan University of Steubenville
| Description |
Retrofitted fire protection systems for university dorms and student center, including wet pipe and sprinkler systems |
| Owner |
Franciscan University of Steubenville |
| General Contractor |
Massaro Corporation |
| Date Completed |
January 2005 |
PA ~ Latrobe Hospital
| Description |
Installed wet and dry sprinkler systems for emergency room relocation |
| Owner |
Latrobe Hospital |
| General Contractor |
A. Martini & Sons |
| Date Completed |
January 2005 |
FL ~ Naval Air Station
| Description |
Retrofitted fire protection systems on Hangar 1000 in Jacksonville, FL while facility was occupied. Replaced overhead wet systems and three fire pumps; installed low level water foam/canon system. |
| Owner |
U.S. Government |
| General Contractor |
Sauer |
| Date Completed |
September 2004 |
Marquette University Parking Structure
| Description |
Fire Protection |
| Owner |
Marquette University |
| General Contractor |
Opus North Corporation |
| Architect |
Opus North Corporation |
| Engineer |
Opus North Corporation |
| Date Completed |
August 2004 |
FL ~ Omni Hotel at ChampionsGate
| Description |
Installed fire protection system for hotel's ballroom, restaurant and retail stores, including 1,000-gallons per minute fire pump, 5,000-head sprinkler system and six standpipes |
| Owner |
Omni Hotels |
| General Contractor |
Welbro |
| Date Completed |
April 2004 |
Marquette University McGuire Center
| Description |
Plumbing, HVAC, Fire Protection |
| Owner |
Marquette University |
| General Contractor |
Opus North Corp |
| Architect |
Opus North Architects |
| Engineer |
Grunau Company |
| Man-hours |
21,171.00 |
| Date Completed |
March 2004 |
Stark Investments
| Description |
Plumbing, HVAC, Fire protection |
| Owner |
Stark Investments |
| General Contractor |
Jansen Group |
| Engineer |
Grunau, Ring & DuChateau |
| Date Completed |
July 2003 |
PA ~ Verizon
| Description |
Furnished standpipes and installed fire department valves, test and drain riser, 180 sprinklers, and 2-hour insulation |
| Owner |
Verizon, PA |
| General Contractor |
Jendoco Construction Company |
| Engineer |
LLI Technologies, Inc. |
| Date Completed |
June 2003 |
Raynor Memorial Library
| Description |
Engineering services, HVAC, Plumbing, Fire protection, Specialty metal fabrication |
| Owner |
Marquette University |
| General Contractor |
Opus North Corporation |
| Architect |
Opus North Architects |
| Engineer |
Grunau Company |
| Man-hours |
16,941.74 |
| Date Completed |
May 2003 |
FL ~ Bethune-Cookman Center for the Performing Arts
| Description |
5 Standpipes, 1250 GPM Fire Pump |
| General Contractor |
Stellar Group |
| Date Completed |
January 2003 |
FL ~ Festival Bay Mall
| Description |
Designed, fabricated and installed 6,500 sprinklers, 46 Hose stations, 1,000 GPM fire pump, 17 systems, water feature |
| General Contractor |
Beck Construction |
| Date Completed |
January 2003 |
FL ~ Mission Space at Disney World
| Description |
Fire protection system install at Disney's theme park |
| Owner |
Walt Disney Company |
| General Contractor |
Mivan Florida, Inc. |
| Date Completed |
January 2003 |
FL ~ Osceola Agricultural Center
| Description |
Installed 4,000 sprinklers, 1000 GPM fire pump in arena and exhibition facility |
| Owner |
Osceola County |
| General Contractor |
Centrex Rooney, Gray Construction |
| Date Completed |
January 2003 |
IN ~ DePauw University
| Description |
INstalled wet pipe sprinkler systems, fire pump, standpipes, and sprinkler heads |
| Owner |
DePauw University |
| General Contractor |
A.A. Huber & Sons |
| Architect |
CSO Architects |
| Date Completed |
January 2003 |
PA ~ Holland Hall at Univ of Pittsburgh
| Description |
Installed wet pipe sprinkler, standpipe, two dry fire protection systems, and replaced fire department valves |
| Owner |
University of Pittsburgh |
| General Contractor |
Burchick Construction Company |
| Engineer |
Burt, Hill, Kosar, Rittleman Associates |
| Date Completed |
January 2003 |
PA ~ Steven C. Foster Memorial Theatre
| Description |
Installed 125 wet and dry sprinklers |
| Owner |
University of Pittsburgh |
| General Contractor |
Poerio, Inc. |
| Architect |
WTW |
| Engineer |
H.F. Lenz |
| Date Completed |
September 2002 |
Army Aviation Support Facility ~ West Bend Hanger
| Description |
Plumbing, Fire Protection |
| Owner |
State of Wisconsin |
| General Contractor |
Sonag Company, Inc. |
| Architect |
Earth Tech |
| Engineer |
PSJ Engineering |
| Date Completed |
August 2002 |
PA ~ Carnegie Museum of Pittsburgh
| Description |
Installed fire line, standpipes, 1,300 sprinkler heads, and electrical wiring of installed flow and tamper switches. Reprogrammed fire alarm panel. |
| Owner |
Carnegie Museum of Pittsburgh |
| Engineer |
Eichleay Engineering, Inc. |
| Date Completed |
August 2002 |
PA ~ Magee Hospital Parking Garage
| Description |
Installed dry pipe sprinkler system and dry standpipe system in parking garage of Magee Hospital |
| Owner |
Magee Women's Hospital |
| General Contractor |
Turner Construction Company |
| Architect |
Tsoi/Kobus Associates |
| Date Completed |
March 2002 |
FL ~ Bloomingdales
| Description |
2,000 Sprinklers, 1250 GPM Fire Pump |
| Owner |
Federated Department Stores |
| Date Completed |
January 2002 |
FL ~ Disney Vacation Club - Beach Club Villas
| Description |
6,000 Sprinklers |
| Owner |
Walt Disney Company |
| General Contractor |
PCL Construction |
| Date Completed |
January 2002 |
FL ~ Gaylord Palm Hotel and Convention Center
| Description |
20,000 Sprinklers, 81 Wet systems, Dry system, Preaction system, 225,000 feet of fire protection piping |
| Owner |
Gaylord Entertainment |
| General Contractor |
Perini, Suitt |
| Date Completed |
January 2002 |
FL ~ Parrish Medical Center
| Description |
Installed 3,600 sprinklers,1000 GPM fire pump |
| General Contractor |
Skanska Construction |
| Date Completed |
January 2002 |
Central City Cyberschool of Milwaukee
| Description |
Plumbing, Site utilities, Fire protection, HVAC |
| Owner |
Milwaukee County |
| General Contractor |
Stevens Construction |
| Architect |
Adrian Guszkowski |
| Engineer |
RJ Miller, Adrian Guszkowski |
| Date Completed |
September 2001 |
Time Warner Cable
| Description |
Engineering services, HVAC, Plumbing, Fire Protection for Time Warner Cable's offices |
| Owner |
Wisconsin Electric |
| General Contractor |
GPD/Gilbane |
| Architect |
Eppstein Uhen |
| Engineer |
Grunau Company |
| Date Completed |
June 2001 |
PA ~ Litchfield Towers- Univ of Pittsburgh
| Description |
Installed wet sprinklers, water service for secondary supply, dry system, and diesel fire pump in Towers A, B, and C with acoustical ceilings and drywall |
| Owner |
University of Pittsburgh |
| Engineer |
Burt, Hill, Kosar, Rittleman Associates |
| Date Completed |
January 2001 |
PA ~ Petersen Events Center
| Description |
Installed 1000 gmp electric fire pump, wet and dry sprinklers |
| Owner |
University of Pittsburgh |
| General Contractor |
Pitt Center Partners |
| Architect |
Apostoluo, Russer |
| Engineer |
Brinjac Engineering |
| Date Completed |
January 2001 |
Potawatomi Bingo Casino
| Description |
Plumbing, Fire protection, HVAC, Specialty metal fabrication, Snow melt system |
| Owner |
Forest County Executive Council-Gaming Commission |
| General Contractor |
Sverdrup, CG Schmidt |
| Architect |
Graef, Anhalt, Schloemer |
| Engineer |
Ring & DuChateau |
| Date Completed |
December 2000 |
St. Luke's Hospital Vertical Expansion
| Description |
Fire protection, HVAC for four floor addition |
| Owner |
Aurora Health Care |
| General Contractor |
Oscar J. Boldt Construction |
| Architect |
Welman Architects |
| Engineer |
Ring & DuChateau |
| Date Completed |
December 2000 |
Marquette University East Hall Renovation
| Description |
Plumbing, Fire protection, HVAC |
| Owner |
Marquette University |
| General Contractor |
Hunzinger Construction |
| Architect |
Eppstein Uhen |
| Engineer |
Grunau Company |
| Date Completed |
September 2000 |
Edison School ~ Remodeling
| Description |
Plumbing, fire protection, and HVAC for 95,000 sq. ft. remodeling |
| Owner |
Milwaukee County |
| General Contractor |
GPD/Gilbane |
| Engineer |
Grunau Company |
| Date Completed |
August 2000 |
FL ~ Kennedy Space Center
| Description |
Wet pipe sprinkler system |
| Owner |
NASA |
| General Contractor |
Ivey's Construction |
| Date Completed |
January 2000 |
FL ~ Epcot Center Millennium Village
| Description |
Sprinkler heads, Deluge system at Disney World's Epcot Center theme park |
| Owner |
Walt Disney Company |
| General Contractor |
American Bridge, Mivan Florida, B.V.C.S |
| Date Completed |
September 1999 |
FL ~ Universal Studios
| Description |
Installed sprinklers in 33 buildings and diesel fire pumps with 4500 feet of underground supply with fire hydrants for Universal Studios theme park |
| Owner |
Universal Studios |
| General Contractor |
Whiting Turner Construction Company |
| Date Completed |
January 1999 |
PA ~ Cherrington Corporate Center
| Description |
Furnished and installed wet pipe sprinkler system with standpipes |
| Owner |
Cherrington Corporate Center, Eaton, Cytler Hammer |
| General Contractor |
Clayco Construction Company, Inc. |
| Engineer |
Code Consultants, Inc. |
| Date Completed |
January 1999 |
PA ~ Southpointe
| Description |
Installed fire sprinklers, standpipes, wet pipe sprinkler systems, alarm and detection systems in various buildings of a commercial and residential development |
| Owner |
Scalo Case Development Company |
| General Contractor |
Mosites Construction Company |
| Architect |
Lorenzi Dodds & Gunill |
| Date Completed |
January 1998 |
McKinley Marina
| Description |
Demolition and installation of new fuel, sanitary, fire, water and electrical systems |
| Owner |
Milwaukee County Department of Public Works, Milwaukee County Parks |
| Date Completed |
May 1996 |