www.grunau.com / Projects

Employee login Customer login

Projects

Services: HVAC

Miller Brewing Company / MillerCoors

Description Engineering services, Underground Site Utilities, Plumbing, HVAC, Service and Maintenance. Grunau Company has provided mechanical services to Miller Brewing Company/MillerCoors for over 35 years. This broad range of services includes all mechanical installations in six new breweries, as well as continuous service to Milwaukee breweries. - View Case Study
Owner MillerCoors
What Our Customers Say Grunau was involved in the construction of many of our buildings and their continued involvement in the day-to-day operations of the facility continues to benefit Miller. The relationship our companies have enjoyed over the years is a testimony to the trust factor we have established and the values we share. The personal involvement by Grunau's management ensures a very high level of customer satisfaction. ~ Tom Blaedon, Corporate Facilities Manager at Miller
Date Completed January 2012

Photo Courtesy of Miller Brewing Company

Advanced Healthcare ~ Mequon

Description Design/Build, Plumbing, HVAC, Fire Protection, Medical Gas
Owner Advanced Healthcare
General Contractor CG Schmidt
Architect Welman Architects
Engineer Grunau Company
Man-hours 11,782.00
Date Completed January 2010

Aurora Medical Center ~ Summit

Description Design/Assist, HVAC, Plumbing, and Specialty Metal Fab for a new state-of-art 800,000 sq ft medical facility encompassing a hospital, clinic, pharmacy, and the Vince Lombardi Cancer Center.
Owner Aurora Health Care / Hammes
General Contractor Mortenson
Architect Kahn
Engineer KJWW
Man-hours 233,000.00
Date Completed December 2009

St. Luke's Hospital - Healing Garden

Description HVAC
Owner Aurora Health Care
General Contractor M. A. Mortenson Company
Architect Brubaker
Man-hours 12,475.00
Date Completed June 2009

Baird ~ Training Floor

Description HVAC, Fire Protection, Specialty Metal Fab
Owner US Bank / Baird Corp.
General Contractor Gilbane
Architect Gensler
Engineer Gosentini
Man-hours 4,882.00
Date Completed April 2009

Advanced Healthcare ~ Grafton

Description HVAC, Plumbing, Fire Protection for healthcare clinic
Owner Advanced Healthcare
General Contractor Midwest Design & Development
Architect Midwest Design & Development
Man-hours 8,378.00
Date Completed December 2008

JohnsonDiversey Ware Wash

Description HVAC, Plumbing
Owner JohnsonDiversey
General Contractor M. A. Mortenson Company
Man-hours 1,553.00
Date Completed December 2008

Wisvest ~ Cooling Tower

Description Grunau completed a cooling tower addition project
Owner Wisvest LLC
Engineer Ring & DuChateau
Man-hours 3,068.00
Date Completed December 2008

Marquette High School

Description Design/Build HVAC, Plumbing, Fire Protection
Owner Marquette
General Contractor C.G. Schmidt
Architect Eppstein Uhen
Engineer Grunau Company
Man-hours 20,477.00
Date Completed November 2008

Advanced Healthcare ~ Medical MRI Suite

Description HVAC, Fire Protection, Plumbing
Owner Advanced Healthcare
General Contractor CG Schmidt
Architect Welman Architects
Engineer Grunau Company
Man-hours 4,240.00
Date Completed August 2008

Northwestern Mutual ~ Franklin Phase II

Description Design/Assist, HVAC, Plumbing, Fire Protection, Specialty Metal Fab
Owner Northwestern Mutual
General Contractor Opus
Architect Eppstein Uhen Architects
Engineer Affiliated Engineers
Man-hours 55,766.00
Date Completed August 2008

Potawatomi Bingo Casino Expansion

Description HVAC, Site Utilities, Parking Deck, Specialty Metal Fab
Owner Forest County Potawatomi Community
General Contractor Gilbane Building Company
Architect Hnedak BoBo Group
Man-hours 40,783.00
Date Completed August 2008

Mayfair Woods Business & Technology Center

Description Design/Build, HVAC
Owner Irgens Development
General Contractor C.G. Schmidt, Inc.
Architect PRA
Engineer Grunau Company
Man-hours 4,722.00
Date Completed May 2008

Metavante ~ Phase II

Description HVAC: Installed PAC units in data center
Owner Metavante
Engineer Miller Engineering
Man-hours 2,878.00
Date Completed December 2007

Metavante ~ UPS System

Description HVAC: Installed UPS system in Data Center
Owner Metavante
Engineer Miller Engineering
Man-hours 1,676.00
Date Completed December 2007

Jewish Home & Care Center

Description Design/Build HVAC & Plumbing - Plumbing Replacement
Owner Jewish Home & Care Center
General Contractor VJS Construction Services
Architect Zimmerman Design Group
Engineer Grunau Company
Man-hours 20,672.00
Date Completed November 2007

Columbia St. Mary's ~ Ozaukee

Description HVAC, Temperature Controls (Electrical)
Owner Columbia St. Mary's
General Contractor M.A. Mortenson Company
Architect HOK
Engineer Ring & DuChateau
Man-hours 30,349.00
Date Completed July 2007

Manpower Corporate Headquarters

Description Design/Build, HVAC, Plumbing, Fire Protection, Underground Site Utilities, Temperature Controls (Electrical), Specialty Metal Fab
Owner Riverbend Place LLC
General Contractor Gilbane Building Co.
Architect Eppstein Uhen Architects
Engineer STS Consultants
Man-hours 28,721.00
Date Completed May 2007

Advanced Healthcare ~ Corporate Headquarters

Description Design/Build, HVAC, Temperature Controls (Electrical)
Owner Advanced Healthcare
General Contractor Midwest Design & Development
Engineer Grunau Company
Date Completed April 2007

Taylor Woods, Water Boosting Station

Description Sitework, Plumbing, HVAC
Owner Village of Menomonee Falls
General Contractor Sonag Company
Architect Clark Dietz, Inc.
Engineer Clark Dietz, Inc.
Man-hours 700.00
Date Completed April 2007

MCW/CRI Biomedical Research Facility

Description HVAC, Plumbing and Medical Gas for Laboratories and Vivarium
Owner MCW/CRI
General Contractor Gilbane Building Co.
Architect HGA
Engineer BR+A
Man-hours 194,148.00
Date Completed January 2007

Prospect Medical Commons

Description Design/Assist HVAC Including Further Development of Current Design
Owner Irgens Development, LLC for Columbia St. Mary's
General Contractor C.G. Schmidt, Inc.
Architect HOK
Engineer Affiliated Engineers
Man-hours 11,645.00
Date Completed December 2006

Fort Memorial Hospital

Description HVAC, Plumbing, Sitework for 116,000 sf Addition and 51,000 sf Remodel
Owner Fort Health Care
General Contractor JP Cullen & Sons
Architect Plunkett Raysich Architects
Engineer Affiliated Engineers
Date Completed August 2006

UWM - Kenilworth Building

Description HVAC for 400,000 sf Redevelopment of Existing Concrete Structure. Multi-use Housing, University Classrooms and Retail Space.
Owner Weas Development for the UW - Milwaukee
General Contractor KBS Construction
Architect HGA
Engineer Grunau Company
Man-hours 28,991.00
Date Completed August 2006

Cenergy - Bucyrus International

Description HVAC System Upgrade
Owner Bucyrus International
Engineer CEnergy/Grunau
Man-hours 12,505.50
Date Completed January 2006

GE Medical Health Center & Research Park

Description Design/Build, HVAC
Owner Irgens Development
General Contractor C.G. Schmidt, Inc.
Architect Eppstein Uhen Architects
Engineer Grunau Company
Date Completed January 2006

Jones Island WWTP

Description Instrumentation and HVAC Upgrades
Owner MMSD
General Contractor Staff Electric
Engineer CDM
Date Completed January 2006

Jones Island WWTP

Description Instrumentation and HVAC Upgrades
Owner MMSD
General Contractor Staff Electric
Engineer CDM
Man-hours 4,479.00
Date Completed January 2006

Prairie School

Description HVAC, Plumbing, Fire Protection
General Contractor Bukacek Construction, Inc
Architect Zimmerman Design Group
Engineer Grunau Company
Man-hours 12,262.00
Date Completed November 2005

HGA

Description Design/Build, HVAC Underfloor System
Owner Mandel Group
General Contractor J.H. Findorff
Architect HGA
Engineer Grunau Company
Man-hours 2,723.00
Date Completed September 2005

Aurora Medical Center ~ Hartford Hospital

Description HVAC and Plumbing for radiology addition and surgery suite remodel
Owner Aurora Medical Center
General Contractor MAC
Architect Plunkett Raysich Architects
Engineer Ring & Duchateau
Date Completed June 2005

API Software

Description Design/Build, HVAC, Plumbing, Underground Site Utilities for Hartford office building
Owner API Software
General Contractor KBS Construction
Architect Excel
Engineer Grunau Company
Date Completed May 2005

Aurora Health Care ~ Computer Room Expansion

Description In a 2-phase computer room expansion project at Aurora Health Care's corporate facility, Grunau installed a new glycol cooler system, fire suppression system, UPS unit and generator, plus Specialty Metals work including rooftop platforms, catwalks, railings and stairs. - View Case Study
Owner Aurora Health Care
General Contractor Grunau Company
Architect Grunau Company
Engineer Grunau Company
Date Completed May 2005

P&H Mining Upgrade

Description HVAC System Upgrade
Owner P&H Mining
General Contractor Cenergy Systems
Date Completed May 2005

St. Luke's Medical Center Histology

Description HVAC, Plumbing, Fire Protection
Owner Aurora - St. Luke's
General Contractor Boldt Construction
Architect Brubaker
Engineer Ring & DuChateau
Date Completed May 2005

Thomson Beta

Description HVAC, Plumbing, Fire Protection, Special Hazards
Owner Thomson Beta
General Contractor Opus Corporation
Architect Eppstein Uhen
Engineer Affiliated Engineers
Date Completed April 2005

Roundy's Distribution Center

Description HVAC and Plumbing
Owner Pabst Farms
Architect Opus & A&E
Engineer Grunau Company
Man-hours 16,427.00
Date Completed March 2005

Marquette University Memorial Library

Description HVAC Remodel of 50 Year Old Library
Owner Marquette University
General Contractor Opus North Corporation
Architect Opus & A&E
Engineer Grunau Company
Date Completed December 2004

VA ESPC

Description Decentralize Steam Plant
Owner VA Medical Center
General Contractor Johnson Controls
Engineer Grunau Company
Date Completed November 2004

Northwestern Mutual ~ Franklin Campus

Description HVAC, Plumbing - View Case Study
Owner Northwestern Mutual
General Contractor Opus North Corporation
Architect Eppstein Uhen
Engineer Affiliated Engineers
Date Completed April 2004

Photo Courtesy of Opus North

Photo courtesy of Northwestern Mutual. Copyright 2004

St. Luke's Heart Care Center and Patient Tower

Description HVAC work for a new cardiac center and patient tower - View Case Study
Owner Aurora Health Care
General Contractor Boldt Construction
Architect Kahler Slater Architects
Engineer Ring & DuChateau
Date Completed March 2004

Wisconsin Heart Hospital

Description HVAC and Plumbing
General Contractor Mortenson
Architect HDR
Engineer HDR
Date Completed January 2004

E-Funds

Description Tenant HVAC build-out
Owner Liberty Property
General Contractor Berghammer Corporation
Architect Zimmerman Design Group
Engineer Grunau Company
Date Completed 2004

St. John's Cathedral

Description AHUs, Chillers
Owner Archdiocese of Milwaukee
General Contractor GPD | Gilbane
Architect Hammel, Green and Abrahamson
Engineer Hammel, Green and Abrahamson
Man-hours 4,103.25
Date Completed 2003

GE Medical Systems

Description HVAC, Plumbing
Owner GE Medical Systems
General Contractor Jansen Group
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed July 2003

Stark Investments

Description Plumbing, HVAC, Fire protection
Owner Stark Investments
General Contractor Jansen Group
Engineer Grunau, Ring & DuChateau
Date Completed July 2003

Honeycreek IV Corporate Center

Description Plumbing, HVAC
Owner Opus North Corporation
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Date Completed May 2003

Marquette University McGuire Center

Description Plumbing, HVAC, Fire Protection
Owner Marquette University
General Contractor Opus North Corp.
Architect Opus North Architects
Engineer Grunau Company
Man-hours 21,171.00
Date Completed May 2003

Raynor Memorial Library

Description Engineering services, HVAC, Plumbing, Fire protection, Specialty metal fabrication
Owner Marquette University
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Man-hours 16,941.74
Date Completed May 2003

School Sisters of St. Francis

Description Engineering services, HVAC
General Contractor Voss Jorgensen Schueler
Architect Eppstein Uhen
Engineer Grunau Company
What Our Customers Say "We are grateful for friends like you who support our mission." Christine Burke-Duecker, Director of Development - School Sisters of St. Francis
Date Completed February 2003

Waukesha Memorial Hospital

Description HVAC, Temperature controls
Owner Waukesha Memorial Hospital
General Contractor CG Schmidt
Architect Engberg Andersen
Engineer Engineering Concepts
Date Completed February 2003

Lakeland Medical Center

Description HVAC
Owner Aurora Health Care
General Contractor Grunau Company
Architect Arnold & O'Sheridan
Engineer Arnold & O'Sheridan
Date Completed January 2003

St. Mary's Hospital - Ozaukee Expansion/Remodel

Description HVAC, Plumbing
Owner Columbia St. Mary's
General Contractor Mortenson
Architect Kahler Slater
Engineer Ring & DuChateau
Man-hours 57,915.51
What Our Customers Say "I just wanted to take a moment to thank you for the expertise and experience that you have brought to the project. Your ability, and the abilities of your team members, has been instrumental in identifying many conflicts and issues for construction." Cindy Finstad, Project Manager - Mortenson
Date Completed January 2003

Marquette University Dental School

Description Plumbing, HVAC, Medical gas system
Owner Marquette University
General Contractor Boldt Construction
Architect Kahler Slater
Engineer Arnold & O'Sheridan
Man-hours 39,047.65
Date Completed August 2002

Boston Store Remodel

Description HVAC, Plumbing, Specialty metal fabrication, Parking and chiller plant upgrade for remodeled tenant building
Owner Wispark LLC
General Contractor GPD/Gilbane
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed June 2002

Edison School

Description Installed high efficiency boilers
Owner Edison School
General Contractor GPD/Gilbane
Engineer Grunau Company
Date Completed October 2001

Runzheimer International ~ Headquarters

Description Engineering services, HVAC
Owner Runzheimer International
General Contractor Berghammer Corporation
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed October 2001

Central City Cyberschool of Milwaukee

Description Plumbing, Site utilities, Fire protection, HVAC
Owner Milwaukee County
General Contractor Stevens Construction
Architect Adrian Guszkowski
Engineer RJ Miller, Adrian Guszkowski
Date Completed September 2001

Honeycreek III Corporate Center

Description Engineering services, HVAC
Owner Opus North Corporation
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Date Completed June 2001

Time Warner Cable

Description Engineering services, HVAC, Plumbing, Fire Protection for Time Warner Cable's offices
Owner Wisconsin Electric
General Contractor GPD/Gilbane
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed June 2001

Vince Lombardi Cancer Clinic

Description HVAC
Owner Aurora, Hammes
General Contractor Mortenson
Engineer Albert Kahn Associates
Date Completed June 2001

Marquette University Todd Wehr Chemistry Building

Description New central supply air/exhaust systems, Plumbing to hoods, Fixtures and lab counter spaces
Owner Marquette University
General Contractor Jens Construction
Architect Holabird & Root
Engineer Affiliated Engineers
Date Completed April 2001

401 Woodland Prime

Description HVAC, Plumbing
Owner Weas Development
Date Completed January 2001

500 Woodland Prime

Description Plumbing, HVAC for a 3-story 120,000 sq ft office building
Owner Weas Development
General Contractor Jansen Company
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed December 2000

Potawatomi Bingo Casino

Description Plumbing, Fire protection, HVAC, Specialty metal fabrication, Snow melt system
Owner Forest County Executive Council-Gaming Commission
General Contractor Sverdrup, CG Schmidt
Architect Graef, Anhalt, Schloemer
Engineer Ring & DuChateau
Date Completed December 2000

St. Luke's Hospital Vertical Expansion

Description Fire protection, HVAC for four floor addition
Owner Aurora Health Care
General Contractor Oscar J. Boldt Construction
Architect Welman Architects
Engineer Ring & DuChateau
Date Completed December 2000

Marquette University East Hall Renovation

Description Plumbing, Fire protection, HVAC
Owner Marquette University
General Contractor Hunzinger Construction
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed September 2000

Wisconsin State Fair Park Renovations

Description Engineering services, Plumbing, HVAC
Owner State of Wisconsin
General Contractor Hunzinger Construction
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed September 2000

Edison School

Description Plumbing, Fire protection, HVAC for 95,000 sq. ft. remodeling
Owner Milwaukee County
General Contractor GPD/Gilbane
Engineer Grunau Company
Date Completed August 2000

Honeycreek II Corporate Center

Description Engineering services, HVAC
Owner Opus North Corporation
General Contractor Opus North Corporation
Architect Opus North Architects
Engineer Grunau Company
Date Completed August 2000

Alternative Living Services ~ Corporate Headquarters

Description Plumbing, HVAC, Underground Site Utilities
Owner ALS
General Contractor Hunzinger Construction
Architect Eppstein Uhen
Engineer Grunau Company
Date Completed January 2000

Whitewater Middle School Hot Water Boilers

Description Electrical, Control wiring, HVAC
Owner Whitewater Unified School District
General Contractor Johnson Controls
Date Completed November 1999

Medical College of Wisconsin Health Research Center

Description HVAC
Owner Medical College of Wisconsin
General Contractor Mortenson
Date Completed June 1999

Downtown Milwaukee YMCA Branch Relocation

Description Engineering services, Plumbing, HVAC, AHU pipe/duct connection at track
Owner Trammell Crow
General Contractor CG Schmidt
What Our Customers Say "We are proud of the outcome and Grunau had a lot to do with its success!" Richard J. Nierzwicki, Vice President of Operations - CG Schmidt, Inc.
Date Completed February 1999

Alverno College ~ Technology Center

Description Plumbing, HVAC, Specialty Metal Fabrication
Owner Alverno College
General Contractor GPD/Gilbane
Date Completed January 1999

Aurora Health Care Center ~ Kenosha

Description HVAC
Owner Aurora Health Care
General Contractor Mortenson
Date Completed January 1999

Howard Avenue Water Purification Plant

Description HVAC, Site plumbing, Process piping, Specialty metal fabrication, Control wiring, Large diameter underground piping
Owner City of Milwaukee
General Contractor BVCI, JSA
Date Completed July 1998

Linwood Water Purification Plant

Description HVAC, Plumbing, Process piping, Specialty metal fabrication, Control wiring, Large diameter underground piping
Owner City of Milwaukee
General Contractor BVCI, JSA
Date Completed July 1998

M&I Data Systems

Description HVAC, Specialty metal fabrication
Owner M&I Bank
General Contractor Oscar J. Boldt Construction
Date Completed June 1997

SC Johnson ~ Worldwide Headquarters

Description HVAC
Owner SC Johnson Worldwide
General Contractor Mortenson, Riley Construction
Date Completed May 1997

Vilter Manufacturing

Description HVAC for 56,000 sq. ft. addition
Owner Vilter Manufacturing
General Contractor Klug & Smith Company
Date Completed April 1996

Capabilities

24/7 Service

    News

    Projects

      Grunau Logo 2
      I wanted to express my appreciation for the flexibility that your crew showed during the equipment removal and placement for our Compound Management Services project at Sigma-Aldrich. Due to roof access constraints, the crew quickly shifted priorities and removed the exhaust fan before placing the make up air unit, which was the reverse of their original plan. Your guys were well prepared, accommodating, and did a professional job and they should be commended as such.”
      - Gary Kok, Project Engineer at Sigma-Aldrich
      more »