Projects
Services: HVAC
Miller Brewing Company / MillerCoors
| Description | Engineering services, Underground Site Utilities, Plumbing, HVAC, Service and Maintenance. Grunau Company has provided mechanical services to Miller Brewing Company/MillerCoors for over 35 years. This broad range of services includes all mechanical installations in six new breweries, as well as continuous service to Milwaukee breweries. - View Case Study |
| Owner | MillerCoors |
| What Our Customers Say | Grunau was involved in the construction of many of our buildings and their continued involvement in the day-to-day operations of the facility continues to benefit Miller. The relationship our companies have enjoyed over the years is a testimony to the trust factor we have established and the values we share. The personal involvement by Grunau's management ensures a very high level of customer satisfaction. ~ Tom Blaedon, Corporate Facilities Manager at Miller |
| Date Completed | January 2012 |
Advanced Healthcare ~ Mequon
| Description | Design/Build, Plumbing, HVAC, Fire Protection, Medical Gas |
| Owner | Advanced Healthcare |
| General Contractor | CG Schmidt |
| Architect | Welman Architects |
| Engineer | Grunau Company |
| Man-hours | 11,782.00 |
| Date Completed | January 2010 |
Aurora Medical Center ~ Summit
| Description | Design/Assist, HVAC, Plumbing, and Specialty Metal Fab for a new state-of-art 800,000 sq ft medical facility encompassing a hospital, clinic, pharmacy, and the Vince Lombardi Cancer Center. |
| Owner | Aurora Health Care / Hammes |
| General Contractor | Mortenson |
| Architect | Kahn |
| Engineer | KJWW |
| Man-hours | 233,000.00 |
| Date Completed | December 2009 |
St. Luke's Hospital - Healing Garden
| Description | HVAC |
| Owner | Aurora Health Care |
| General Contractor | M. A. Mortenson Company |
| Architect | Brubaker |
| Man-hours | 12,475.00 |
| Date Completed | June 2009 |
Baird ~ Training Floor
| Description | HVAC, Fire Protection, Specialty Metal Fab |
| Owner | US Bank / Baird Corp. |
| General Contractor | Gilbane |
| Architect | Gensler |
| Engineer | Gosentini |
| Man-hours | 4,882.00 |
| Date Completed | April 2009 |
Advanced Healthcare ~ Grafton
| Description | HVAC, Plumbing, Fire Protection for healthcare clinic |
| Owner | Advanced Healthcare |
| General Contractor | Midwest Design & Development |
| Architect | Midwest Design & Development |
| Man-hours | 8,378.00 |
| Date Completed | December 2008 |
JohnsonDiversey Ware Wash
| Description | HVAC, Plumbing |
| Owner | JohnsonDiversey |
| General Contractor | M. A. Mortenson Company |
| Man-hours | 1,553.00 |
| Date Completed | December 2008 |
Wisvest ~ Cooling Tower
| Description | Grunau completed a cooling tower addition project |
| Owner | Wisvest LLC |
| Engineer | Ring & DuChateau |
| Man-hours | 3,068.00 |
| Date Completed | December 2008 |
Marquette High School
| Description | Design/Build HVAC, Plumbing, Fire Protection |
| Owner | Marquette |
| General Contractor | C.G. Schmidt |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| Man-hours | 20,477.00 |
| Date Completed | November 2008 |
Advanced Healthcare ~ Medical MRI Suite
| Description | HVAC, Fire Protection, Plumbing |
| Owner | Advanced Healthcare |
| General Contractor | CG Schmidt |
| Architect | Welman Architects |
| Engineer | Grunau Company |
| Man-hours | 4,240.00 |
| Date Completed | August 2008 |
Northwestern Mutual ~ Franklin Phase II
| Description | Design/Assist, HVAC, Plumbing, Fire Protection, Specialty Metal Fab |
| Owner | Northwestern Mutual |
| General Contractor | Opus |
| Architect | Eppstein Uhen Architects |
| Engineer | Affiliated Engineers |
| Man-hours | 55,766.00 |
| Date Completed | August 2008 |
Potawatomi Bingo Casino Expansion
| Description | HVAC, Site Utilities, Parking Deck, Specialty Metal Fab |
| Owner | Forest County Potawatomi Community |
| General Contractor | Gilbane Building Company |
| Architect | Hnedak BoBo Group |
| Man-hours | 40,783.00 |
| Date Completed | August 2008 |
Mayfair Woods Business & Technology Center
| Description | Design/Build, HVAC |
| Owner | Irgens Development |
| General Contractor | C.G. Schmidt, Inc. |
| Architect | PRA |
| Engineer | Grunau Company |
| Man-hours | 4,722.00 |
| Date Completed | May 2008 |
Metavante ~ Phase II
| Description | HVAC: Installed PAC units in data center |
| Owner | Metavante |
| Engineer | Miller Engineering |
| Man-hours | 2,878.00 |
| Date Completed | December 2007 |
Metavante ~ UPS System
| Description | HVAC: Installed UPS system in Data Center |
| Owner | Metavante |
| Engineer | Miller Engineering |
| Man-hours | 1,676.00 |
| Date Completed | December 2007 |
Jewish Home & Care Center
| Description | Design/Build HVAC & Plumbing - Plumbing Replacement |
| Owner | Jewish Home & Care Center |
| General Contractor | VJS Construction Services |
| Architect | Zimmerman Design Group |
| Engineer | Grunau Company |
| Man-hours | 20,672.00 |
| Date Completed | November 2007 |
Columbia St. Mary's ~ Ozaukee
| Description | HVAC, Temperature Controls (Electrical) |
| Owner | Columbia St. Mary's |
| General Contractor | M.A. Mortenson Company |
| Architect | HOK |
| Engineer | Ring & DuChateau |
| Man-hours | 30,349.00 |
| Date Completed | July 2007 |
Manpower Corporate Headquarters
| Description | Design/Build, HVAC, Plumbing, Fire Protection, Underground Site Utilities, Temperature Controls (Electrical), Specialty Metal Fab |
| Owner | Riverbend Place LLC |
| General Contractor | Gilbane Building Co. |
| Architect | Eppstein Uhen Architects |
| Engineer | STS Consultants |
| Man-hours | 28,721.00 |
| Date Completed | May 2007 |
Advanced Healthcare ~ Corporate Headquarters
| Description | Design/Build, HVAC, Temperature Controls (Electrical) |
| Owner | Advanced Healthcare |
| General Contractor | Midwest Design & Development |
| Engineer | Grunau Company |
| Date Completed | April 2007 |
Taylor Woods, Water Boosting Station
| Description | Sitework, Plumbing, HVAC |
| Owner | Village of Menomonee Falls |
| General Contractor | Sonag Company |
| Architect | Clark Dietz, Inc. |
| Engineer | Clark Dietz, Inc. |
| Man-hours | 700.00 |
| Date Completed | April 2007 |
MCW/CRI Biomedical Research Facility
| Description | HVAC, Plumbing and Medical Gas for Laboratories and Vivarium |
| Owner | MCW/CRI |
| General Contractor | Gilbane Building Co. |
| Architect | HGA |
| Engineer | BR+A |
| Man-hours | 194,148.00 |
| Date Completed | January 2007 |
Prospect Medical Commons
| Description | Design/Assist HVAC Including Further Development of Current Design |
| Owner | Irgens Development, LLC for Columbia St. Mary's |
| General Contractor | C.G. Schmidt, Inc. |
| Architect | HOK |
| Engineer | Affiliated Engineers |
| Man-hours | 11,645.00 |
| Date Completed | December 2006 |
Fort Memorial Hospital
| Description | HVAC, Plumbing, Sitework for 116,000 sf Addition and 51,000 sf Remodel |
| Owner | Fort Health Care |
| General Contractor | JP Cullen & Sons |
| Architect | Plunkett Raysich Architects |
| Engineer | Affiliated Engineers |
| Date Completed | August 2006 |
UWM - Kenilworth Building
| Description | HVAC for 400,000 sf Redevelopment of Existing Concrete Structure. Multi-use Housing, University Classrooms and Retail Space. |
| Owner | Weas Development for the UW - Milwaukee |
| General Contractor | KBS Construction |
| Architect | HGA |
| Engineer | Grunau Company |
| Man-hours | 28,991.00 |
| Date Completed | August 2006 |
Cenergy - Bucyrus International
| Description | HVAC System Upgrade |
| Owner | Bucyrus International |
| Engineer | CEnergy/Grunau |
| Man-hours | 12,505.50 |
| Date Completed | January 2006 |
GE Medical Health Center & Research Park
| Description | Design/Build, HVAC |
| Owner | Irgens Development |
| General Contractor | C.G. Schmidt, Inc. |
| Architect | Eppstein Uhen Architects |
| Engineer | Grunau Company |
| Date Completed | January 2006 |
Jones Island WWTP
| Description | Instrumentation and HVAC Upgrades |
| Owner | MMSD |
| General Contractor | Staff Electric |
| Engineer | CDM |
| Date Completed | January 2006 |
Jones Island WWTP
| Description | Instrumentation and HVAC Upgrades |
| Owner | MMSD |
| General Contractor | Staff Electric |
| Engineer | CDM |
| Man-hours | 4,479.00 |
| Date Completed | January 2006 |
Prairie School
| Description | HVAC, Plumbing, Fire Protection |
| General Contractor | Bukacek Construction, Inc |
| Architect | Zimmerman Design Group |
| Engineer | Grunau Company |
| Man-hours | 12,262.00 |
| Date Completed | November 2005 |
HGA
| Description | Design/Build, HVAC Underfloor System |
| Owner | Mandel Group |
| General Contractor | J.H. Findorff |
| Architect | HGA |
| Engineer | Grunau Company |
| Man-hours | 2,723.00 |
| Date Completed | September 2005 |
Aurora Medical Center ~ Hartford Hospital
| Description | HVAC and Plumbing for radiology addition and surgery suite remodel |
| Owner | Aurora Medical Center |
| General Contractor | MAC |
| Architect | Plunkett Raysich Architects |
| Engineer | Ring & Duchateau |
| Date Completed | June 2005 |
API Software
| Description | Design/Build, HVAC, Plumbing, Underground Site Utilities for Hartford office building |
| Owner | API Software |
| General Contractor | KBS Construction |
| Architect | Excel |
| Engineer | Grunau Company |
| Date Completed | May 2005 |
Aurora Health Care ~ Computer Room Expansion
| Description | In a 2-phase computer room expansion project at Aurora Health Care's corporate facility, Grunau installed a new glycol cooler system, fire suppression system, UPS unit and generator, plus Specialty Metals work including rooftop platforms, catwalks, railings and stairs. - View Case Study |
| Owner | Aurora Health Care |
| General Contractor | Grunau Company |
| Architect | Grunau Company |
| Engineer | Grunau Company |
| Date Completed | May 2005 |
P&H Mining Upgrade
| Description | HVAC System Upgrade |
| Owner | P&H Mining |
| General Contractor | Cenergy Systems |
| Date Completed | May 2005 |
St. Luke's Medical Center Histology
| Description | HVAC, Plumbing, Fire Protection |
| Owner | Aurora - St. Luke's |
| General Contractor | Boldt Construction |
| Architect | Brubaker |
| Engineer | Ring & DuChateau |
| Date Completed | May 2005 |
Thomson Beta
| Description | HVAC, Plumbing, Fire Protection, Special Hazards |
| Owner | Thomson Beta |
| General Contractor | Opus Corporation |
| Architect | Eppstein Uhen |
| Engineer | Affiliated Engineers |
| Date Completed | April 2005 |
Roundy's Distribution Center
| Description | HVAC and Plumbing |
| Owner | Pabst Farms |
| Architect | Opus & A&E |
| Engineer | Grunau Company |
| Man-hours | 16,427.00 |
| Date Completed | March 2005 |
Marquette University Memorial Library
| Description | HVAC Remodel of 50 Year Old Library |
| Owner | Marquette University |
| General Contractor | Opus North Corporation |
| Architect | Opus & A&E |
| Engineer | Grunau Company |
| Date Completed | December 2004 |
VA ESPC
| Description | Decentralize Steam Plant |
| Owner | VA Medical Center |
| General Contractor | Johnson Controls |
| Engineer | Grunau Company |
| Date Completed | November 2004 |
Northwestern Mutual ~ Franklin Campus
| Description | HVAC, Plumbing - View Case Study |
| Owner | Northwestern Mutual |
| General Contractor | Opus North Corporation |
| Architect | Eppstein Uhen |
| Engineer | Affiliated Engineers |
| Date Completed | April 2004 |
St. Luke's Heart Care Center and Patient Tower
| Description | HVAC work for a new cardiac center and patient tower - View Case Study |
| Owner | Aurora Health Care |
| General Contractor | Boldt Construction |
| Architect | Kahler Slater Architects |
| Engineer | Ring & DuChateau |
| Date Completed | March 2004 |
Wisconsin Heart Hospital
| Description | HVAC and Plumbing |
| General Contractor | Mortenson |
| Architect | HDR |
| Engineer | HDR |
| Date Completed | January 2004 |
E-Funds
| Description | Tenant HVAC build-out |
| Owner | Liberty Property |
| General Contractor | Berghammer Corporation |
| Architect | Zimmerman Design Group |
| Engineer | Grunau Company |
| Date Completed | 2004 |
St. John's Cathedral
| Description | AHUs, Chillers |
| Owner | Archdiocese of Milwaukee |
| General Contractor | GPD | Gilbane |
| Architect | Hammel, Green and Abrahamson |
| Engineer | Hammel, Green and Abrahamson |
| Man-hours | 4,103.25 |
| Date Completed | 2003 |
GE Medical Systems
| Description | HVAC, Plumbing |
| Owner | GE Medical Systems |
| General Contractor | Jansen Group |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| Date Completed | July 2003 |
Stark Investments
| Description | Plumbing, HVAC, Fire protection |
| Owner | Stark Investments |
| General Contractor | Jansen Group |
| Engineer | Grunau, Ring & DuChateau |
| Date Completed | July 2003 |
Honeycreek IV Corporate Center
| Description | Plumbing, HVAC |
| Owner | Opus North Corporation |
| General Contractor | Opus North Corporation |
| Architect | Opus North Architects |
| Engineer | Grunau Company |
| Date Completed | May 2003 |
Marquette University McGuire Center
| Description | Plumbing, HVAC, Fire Protection |
| Owner | Marquette University |
| General Contractor | Opus North Corp. |
| Architect | Opus North Architects |
| Engineer | Grunau Company |
| Man-hours | 21,171.00 |
| Date Completed | May 2003 |
Raynor Memorial Library
| Description | Engineering services, HVAC, Plumbing, Fire protection, Specialty metal fabrication |
| Owner | Marquette University |
| General Contractor | Opus North Corporation |
| Architect | Opus North Architects |
| Engineer | Grunau Company |
| Man-hours | 16,941.74 |
| Date Completed | May 2003 |
School Sisters of St. Francis
| Description | Engineering services, HVAC |
| General Contractor | Voss Jorgensen Schueler |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| What Our Customers Say | "We are grateful for friends like you who support our mission." Christine Burke-Duecker, Director of Development - School Sisters of St. Francis |
| Date Completed | February 2003 |
Waukesha Memorial Hospital
| Description | HVAC, Temperature controls |
| Owner | Waukesha Memorial Hospital |
| General Contractor | CG Schmidt |
| Architect | Engberg Andersen |
| Engineer | Engineering Concepts |
| Date Completed | February 2003 |
Lakeland Medical Center
| Description | HVAC |
| Owner | Aurora Health Care |
| General Contractor | Grunau Company |
| Architect | Arnold & O'Sheridan |
| Engineer | Arnold & O'Sheridan |
| Date Completed | January 2003 |
St. Mary's Hospital - Ozaukee Expansion/Remodel
| Description | HVAC, Plumbing |
| Owner | Columbia St. Mary's |
| General Contractor | Mortenson |
| Architect | Kahler Slater |
| Engineer | Ring & DuChateau |
| Man-hours | 57,915.51 |
| What Our Customers Say | "I just wanted to take a moment to thank you for the expertise and experience that you have brought to the project. Your ability, and the abilities of your team members, has been instrumental in identifying many conflicts and issues for construction." Cindy Finstad, Project Manager - Mortenson |
| Date Completed | January 2003 |
Marquette University Dental School
| Description | Plumbing, HVAC, Medical gas system |
| Owner | Marquette University |
| General Contractor | Boldt Construction |
| Architect | Kahler Slater |
| Engineer | Arnold & O'Sheridan |
| Man-hours | 39,047.65 |
| Date Completed | August 2002 |
Boston Store Remodel
| Description | HVAC, Plumbing, Specialty metal fabrication, Parking and chiller plant upgrade for remodeled tenant building |
| Owner | Wispark LLC |
| General Contractor | GPD/Gilbane |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| Date Completed | June 2002 |
Edison School
| Description | Installed high efficiency boilers |
| Owner | Edison School |
| General Contractor | GPD/Gilbane |
| Engineer | Grunau Company |
| Date Completed | October 2001 |
Runzheimer International ~ Headquarters
| Description | Engineering services, HVAC |
| Owner | Runzheimer International |
| General Contractor | Berghammer Corporation |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| Date Completed | October 2001 |
Central City Cyberschool of Milwaukee
| Description | Plumbing, Site utilities, Fire protection, HVAC |
| Owner | Milwaukee County |
| General Contractor | Stevens Construction |
| Architect | Adrian Guszkowski |
| Engineer | RJ Miller, Adrian Guszkowski |
| Date Completed | September 2001 |
Honeycreek III Corporate Center
| Description | Engineering services, HVAC |
| Owner | Opus North Corporation |
| General Contractor | Opus North Corporation |
| Architect | Opus North Architects |
| Engineer | Grunau Company |
| Date Completed | June 2001 |
Time Warner Cable
| Description | Engineering services, HVAC, Plumbing, Fire Protection for Time Warner Cable's offices |
| Owner | Wisconsin Electric |
| General Contractor | GPD/Gilbane |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| Date Completed | June 2001 |
Vince Lombardi Cancer Clinic
| Description | HVAC |
| Owner | Aurora, Hammes |
| General Contractor | Mortenson |
| Engineer | Albert Kahn Associates |
| Date Completed | June 2001 |
Marquette University Todd Wehr Chemistry Building
| Description | New central supply air/exhaust systems, Plumbing to hoods, Fixtures and lab counter spaces |
| Owner | Marquette University |
| General Contractor | Jens Construction |
| Architect | Holabird & Root |
| Engineer | Affiliated Engineers |
| Date Completed | April 2001 |
500 Woodland Prime
| Description | Plumbing, HVAC for a 3-story 120,000 sq ft office building |
| Owner | Weas Development |
| General Contractor | Jansen Company |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| Date Completed | December 2000 |
Potawatomi Bingo Casino
| Description | Plumbing, Fire protection, HVAC, Specialty metal fabrication, Snow melt system |
| Owner | Forest County Executive Council-Gaming Commission |
| General Contractor | Sverdrup, CG Schmidt |
| Architect | Graef, Anhalt, Schloemer |
| Engineer | Ring & DuChateau |
| Date Completed | December 2000 |
St. Luke's Hospital Vertical Expansion
| Description | Fire protection, HVAC for four floor addition |
| Owner | Aurora Health Care |
| General Contractor | Oscar J. Boldt Construction |
| Architect | Welman Architects |
| Engineer | Ring & DuChateau |
| Date Completed | December 2000 |
Marquette University East Hall Renovation
| Description | Plumbing, Fire protection, HVAC |
| Owner | Marquette University |
| General Contractor | Hunzinger Construction |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| Date Completed | September 2000 |
Wisconsin State Fair Park Renovations
| Description | Engineering services, Plumbing, HVAC |
| Owner | State of Wisconsin |
| General Contractor | Hunzinger Construction |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| Date Completed | September 2000 |
Edison School
| Description | Plumbing, Fire protection, HVAC for 95,000 sq. ft. remodeling |
| Owner | Milwaukee County |
| General Contractor | GPD/Gilbane |
| Engineer | Grunau Company |
| Date Completed | August 2000 |
Honeycreek II Corporate Center
| Description | Engineering services, HVAC |
| Owner | Opus North Corporation |
| General Contractor | Opus North Corporation |
| Architect | Opus North Architects |
| Engineer | Grunau Company |
| Date Completed | August 2000 |
Alternative Living Services ~ Corporate Headquarters
| Description | Plumbing, HVAC, Underground Site Utilities |
| Owner | ALS |
| General Contractor | Hunzinger Construction |
| Architect | Eppstein Uhen |
| Engineer | Grunau Company |
| Date Completed | January 2000 |
Whitewater Middle School Hot Water Boilers
| Description | Electrical, Control wiring, HVAC |
| Owner | Whitewater Unified School District |
| General Contractor | Johnson Controls |
| Date Completed | November 1999 |
Medical College of Wisconsin Health Research Center
| Description | HVAC |
| Owner | Medical College of Wisconsin |
| General Contractor | Mortenson |
| Date Completed | June 1999 |
Downtown Milwaukee YMCA Branch Relocation
| Description | Engineering services, Plumbing, HVAC, AHU pipe/duct connection at track |
| Owner | Trammell Crow |
| General Contractor | CG Schmidt |
| What Our Customers Say | "We are proud of the outcome and Grunau had a lot to do with its success!" Richard J. Nierzwicki, Vice President of Operations - CG Schmidt, Inc. |
| Date Completed | February 1999 |
Alverno College ~ Technology Center
| Description | Plumbing, HVAC, Specialty Metal Fabrication |
| Owner | Alverno College |
| General Contractor | GPD/Gilbane |
| Date Completed | January 1999 |
Aurora Health Care Center ~ Kenosha
| Description | HVAC |
| Owner | Aurora Health Care |
| General Contractor | Mortenson |
| Date Completed | January 1999 |
Howard Avenue Water Purification Plant
| Description | HVAC, Site plumbing, Process piping, Specialty metal fabrication, Control wiring, Large diameter underground piping |
| Owner | City of Milwaukee |
| General Contractor | BVCI, JSA |
| Date Completed | July 1998 |
Linwood Water Purification Plant
| Description | HVAC, Plumbing, Process piping, Specialty metal fabrication, Control wiring, Large diameter underground piping |
| Owner | City of Milwaukee |
| General Contractor | BVCI, JSA |
| Date Completed | July 1998 |
M&I Data Systems
| Description | HVAC, Specialty metal fabrication |
| Owner | M&I Bank |
| General Contractor | Oscar J. Boldt Construction |
| Date Completed | June 1997 |
SC Johnson ~ Worldwide Headquarters
| Description | HVAC |
| Owner | SC Johnson Worldwide |
| General Contractor | Mortenson, Riley Construction |
| Date Completed | May 1997 |