Potawatomi Bingo & Casino Renovation
| Description |
Fire Protection - Sitework |
| Owner |
Forest County Potawatomi Community |
| General Contractor |
Titan Construction |
| Architect |
Schultz Werk Architecture |
| Date Completed |
2007 |
Flint Hills Resources
| Description |
Fire Protection |
| General Contractor |
Burns McDonnell |
| Architect |
Burns McDonnell |
| What Our Customers Say |
The fire protection system at the Flint Hills Resources Milwaukee Terminal offered some unique challenges to Grunau, and they performed exceptionally at every turn. The site restrictions and customer expectations could not have been any higher, and the Grunau personnel rose above the restrictions and led the effort to complete, commission, and train the Owner on a system that they were not familiar with. Performance specifications can often prove difficult with subcontractors that are not familiar with a design-build firm, but Grunau provided excellent services and delivered on their promise. It was a pleasure to have the opportunity to work with Eric Radke and the good people at Grunau. Eric Kirchhofer, Project Manager Burns McDonnell |
| Date Completed |
December 2006 |
1000-gallon foam storage tank which supplies AFFF to extinguish fires loading dock protected by deluge system
Blood Center of Wisconsin
| Description |
Sitework & Fire Protection |
| Owner |
Blood Center Research Institute |
| General Contractor |
M.A. Mortenson |
| Architect |
HGA |
| Date Completed |
November 2006 |
Carma Distribution Facility & Warehouse
| Description |
Design/Build Fire Protection, Plumbing & HVAC - Sitework |
| Owner |
Carma Labs |
| General Contractor |
J.H. Findorff & Sons |
| Engineer |
Grunau Company |
| Date Completed |
October 2006 |
211 West Wisconsin Avenue
| Description |
Fire Protection, Plumbing, Sitework |
| General Contractor |
Berghammer Corporation |
| Architect |
Eppstein Uhen Architects |
| Date Completed |
June 2006 |
Indianapolis Office - Allomatic Products Company
| Description |
Installed wet pipe fire protection systems, halon system, service, maintenance and inspection for systems |
| Owner |
Allomatic Products Company |
| Date Completed |
Fall 2005, Inspections Ongoing |
Indianapolis Office - Artsgarden
| Description |
Designed wet pipe fire protection system to follow rounded building structure, Milwaukee office fabricated piping network |
| Owner |
Simon Malls |
| Date Completed |
Fall 1994 |
Indianapolis Office - Ben Davis High School
| Description |
Wet pipe fire protection systems |
| Date Completed |
Fall 2001 |
Indianapolis Office - Decatur Intermediate School
| Description |
Installed 1,200 fire protection sprinklers |
| Owner |
Decatur Township |
| Architect |
CSO Schenkel Shultz Architects |
| Date Completed |
Fall 2005 |
Indianapolis Office - Dow Agrosciences
| Description |
Inspection of wet pipe fire protection systems for research center, preaction system, fire pump |
| Owner |
Dow Chemical Company |
| Date Completed |
Inspection/Modifications Ongoing |
Indianapolis Office - Embassy Suites Downtown and North Locations
| Description |
Inspection of diesel fire pump, wet pipe fire protection system, anti-freeze system |
| Owner |
Embassy Suites Hotels |
| Date Completed |
Inspection/Modifications Ongoing |
Indianapolis Office - Emison Art Center
| Description |
Installed preaction fire protection systems in areaas with non-replaceable art pieces, wet pipe sprinkler systems |
| Owner |
DePauw University |
| General Contractor |
Shiel Sexton |
| Architect |
CSO Schenkel Shultz Architects |
| Engineer |
F & G Engineers, Inc. |
| Date Completed |
Fall 2005 |
Indianapolis Office - General Electric Plant
| Description |
Two fire pump systems (one electric, one diesel), 20 wet pipe systems, dry pipe system, foam system |
| Owner |
General Electric |
| Date Completed |
Inspections/Modifications Ongoing |
Indianapolis Office - Market Tower
| Description |
Inspection of electric fire pump, two dry pipe systems, wet pipe system, preaction systems, fire protection system service, mainenance and inspection |
| Owner |
Colliers Turley Martin Tucker |
| Date Completed |
Inspection/Maintenance Ongoing |
Indianapolis Office - Nordstrom
| Description |
Installed several dry pipe systems, wet pipe system |
| Owner |
Nordstrom |
| Date Completed |
Fall 2004 |
Indianapolis Office - One American Square
| Description |
Installed kitchen hood fire suppression system, halon system, preaction system, two anti-freeze systems, three dry pipe systems, wet pipe system, two fire pumps (one electric, one diesel) |
| Owner |
Colliers Turley Martin Tucker |
| Date Completed |
Inspections/Modifications Ongoing |
Indianapolis Office - Purdue Biomedical Building
| Description |
Four wet pipe sprinkler systems, total of 1,200 sprinkler heads, dry standpipe fire protection |
| Owner |
Purdue University |
| General Contractor |
Kettlehut Construction, Inc. |
| Architect |
BSA LifeStructures |
| Engineer |
BSA LifeStructures |
| Date Completed |
Fall 2006 |
Indianapolis Office - Regis Bank Tower
| Description |
Installed two dry pipe fire protection systems, wet pipe system, three deluge systems, electric fire pump, service, maintenance and inspections |
| Owner |
McKnight Property Management, LLC |
| Date Completed |
Inspections/Modifications Ongoing |
Indianapolis Office - Reilly Chemical Company
| Description |
Installed fire protection systems for chemical plant, two fire pumps (electric and diesel), wet and dry pipe systems, deluge tank system, foam systems, two preaction systems |
| Owner |
Reilly Industries |
| Date Completed |
Inspections/Modifications Ongoing |
Indianapolis Office - Rose-Hulman Institute of Technology
| Description |
Service, maintenance inspections and installation of fire protection systems, including 37 wet pipe systems, five dry pipe systems, one anti-freeze system and two fire pumps (one electrical, one diesel). |
| Owner |
Rose Hulman-Institute of Technology |
| Date Completed |
Ongoing |
Indianapolis Office - St. John's Medical Center
| Description |
Installed several wet and dry pipe fire protection systems, anti-freeze system and preaction system |
| Owner |
St. Vincent Health |
| Date Completed |
Inspection/Modifications Ongoing |
Indianapolis Office - State Office Building Complex
| Description |
Installed wet and dry pipe fire protection systems, two fire pumps (electric and diesel) |
| Owner |
State of Indiana |
| General Contractor |
Glenroy Construction |
| Date Completed |
Fall 1990 |
Indianapolis Office - U.S. Air Maintenance Aircraft Hanger
| Description |
Wet pipe fire protection systems, foam systems, five diesel fire pumps, deluge systems, two water storage tanks |
| Owner |
U.S. Air |
| Date Completed |
Summer 1990 |
Indianapolis Office - United Airlines Maintenance Hangers
| Description |
Wet fire protections systems, foam systems |
| Owner |
United Airlines |
| Date Completed |
Summer 1994 |
Orlando Office - Holmes Regional Medical Center
| Description |
Installed fire protection systems in eight-story expansion including operating room and trauma units, a foam system for the helo-port, three standpipes, and a 3,800-head sprinkler system. |
| Owner |
Health First |
| General Contractor |
Bovis Lend Lease |
| Date Completed |
Ongoing |
Orlando Office - Pinellas County Jail
| Description |
Outfitted cells and dormitory housing with fire protection systems, 750-gallons per minute fire pumps, six standpipes and a 1,500-head sprinkler system. |
| Owner |
Pinellas County |
| General Contractor |
Skanska |
| Date Completed |
Ongoing |
Pittsburgh Office - Alliant Foodservice
| Description |
Converted wet fire protection system to dry system. Installed a double-lock preaction system in a cooler/freezer and an Early Suppression, Fast Response (ESFR) wet system for dry storage. |
| Owner |
Alliant Foodservice |
| General Contractor |
Environmental Structures |
| Date Completed |
Ongoing |
Pittsburgh Office - Biomedical Science Tower 3 at the University of Pittsburgh
| Description |
Installed wet and dry fire protection systems in a new 10-story biomedical science building on campus, including two preaction systems and two clean agent suppression systems. |
| Owner |
University of Pittsburgh |
| General Contractor |
Mascaro/Hunt |
| Date Completed |
Winter 2005 |
Pittsburgh Office - JC Williams Hall and St. Thomas More Hall at Franciscan University of Steubenville
| Description |
Retrofitted fire protection systems for dorms and student center, including wet pipe and sprinkler systems. |
| Owner |
Franciscan University of Steubenville |
| General Contractor |
Massaro Corporation |
| Date Completed |
Ongoing |
Pittsburgh Office - Latrobe Hospital
| Description |
Installed wet and dry sprinkler systems for emergency room relocation. |
| Owner |
Latrobe Hospital |
| General Contractor |
A. Martini & Sons |
| Date Completed |
Ongoing |
Indianapolis Office - Carmel High School Freshman Center
| Description |
Installed fire protection systems in new "freshman" facility, including a fire pump, standpipes, five sprinkler systems and 2,000 feet of underground water mains. |
| Owner |
Carmel Clay School Corporation |
| General Contractor |
The Skillman Corporation (Construction Manager) |
| Architect |
Fanning/Howey Associates |
| Engineer |
Fanning/Howey Associates |
| Date Completed |
August 2005 |
Orlando Office - Kennedy Space Center, Shuttle Launch Pads A and B
| Description |
Retrofitted fire protection systems, including preaction, a fixed water spray system in tunnels leading to the launch pads, and adjusted PRV sprinklers to tie into high pressure underground extinguishing system. |
| Owner |
NASA |
| General Contractor |
Ivey's Construction |
| Date Completed |
August 2005 |
St. Luke's Medical Center Histology
| Description |
HVAC, Plumbing, Fire Protection |
| Owner |
Aurora - St. Luke's |
| General Contractor |
Boldt Construction |
| Architect |
Brubaker |
| Engineer |
Ring & DuChateau |
| Date Completed |
May 2005 |
Orlando Office - Disneyland Soarin' Over California theme park attraction
| Description |
Installed a fire protection system for Disney's newest simulator ride. Blended sprinklers into the scenes and background of the ride. |
| Owner |
Watl Disney World |
| General Contractor |
PCL Construction |
| Date Completed |
April 2005 |
Thomson Beta
| Description |
HVAC, Plumbing, Fire Protection, Special Hazards |
| Owner |
Thomson Beta |
| General Contractor |
Opus Corporation |
| Architect |
Eppstein Uhen |
| Engineer |
Affiliated Engineers |
| Date Completed |
April 2005 |
Orlando Office - Naval Air Station, Jacksonville, Fla., Hanger 1000
| Description |
Retrofitted fire protection systems on hanger while occupied. Replaced overhead wet systems and three fire pumps and installed low level water foam/canon system. |
| Owner |
U.S. Government |
| General Contractor |
Sauer |
| Date Completed |
September 2004 |
Marquette University Parking Structure
| Description |
Fire Protection |
| Owner |
Marquette University |
| General Contractor |
Opus North Corporation |
| Architect |
Opus North Corporation |
| Engineer |
Opus North Corporation |
| Date Completed |
August 2004 |
Orlando Office - Omni Hotel at ChampionsGate
| Description |
Installed fire protection system for hotel's ballroom, restaurant and retail stores, including 1,000-gallons per minute fire pump, 5,000-head sprinkler system and six standpipes. |
| Owner |
Omni Hotels |
| General Contractor |
Welbro |
| Date Completed |
April 2004 |
Advanced Health Care
| Description |
HVAC, Plumbing, Fire Protection |
| Owner |
Advanced Health Care |
| General Contractor |
C.G. Schmidt |
| Architect |
Welmann Architects |
| Engineer |
Grunau Company |
| Date Completed |
February 2004 |
Indianapolis Office - DePauw University
| Description |
Wet pipe sprinkler systems, Fire pump, Standpipes, Sprinkler heads |
| Owner |
DePauw University |
| General Contractor |
A.A. Huber & Sons |
| Architect |
CSO Architects |
| Date Completed |
2003 |
Orlando Office - Bethune-Cookman Center for the Performing Arts
| Description |
5 Standpipes, 1250 GPM Fire Pump |
| General Contractor |
Stellar Group |
| Date Completed |
2003 |
Orlando Office - Festival Bay Mall
| Description |
Designed, fabricated and installed 6,500 sprinklers, 46 Hose stations, 1,000 GPM fire pump, 17 systems, water feature |
| General Contractor |
Beck Construction |
| Date Completed |
2003 |
Orlando Office - Mission Space-Walt Disney World
| Description |
Fire protection |
| Owner |
Walt Disney Company |
| General Contractor |
Mivan Florida, Inc. |
| Date Completed |
2003 |
Orlando Office - Osceola Agricultural Center
| Description |
4,000 Sprinklers, 1000 GPM fire pump |
| General Contractor |
Centrex Rooney, Gray Construction |
| Date Completed |
2003 |
Pittburgh Office - Holland Hall
| Description |
Installed wet pipe sprinkler, Standpipe, Two dry systems, Replaced fire department values |
| Owner |
University of Pittsburgh |
| General Contractor |
Burchick Construction Company |
| Engineer |
Burt, Hill, Kosar, Rittleman Associates |
| Date Completed |
2003 |
Milwaukee Office - Medical MRI Suite
| Description |
HVAC, Fire protection, Plumbing |
| Owner |
Advanced Healthcare |
| General Contractor |
CG Schmidt |
| Architect |
Welman Architects |
| Engineer |
Grunau Company |
| Date Completed |
August 2003 |
Milwaukee Office - Stark Investments
| Description |
Plumbing, HVAC, Fire protection |
| Owner |
Stark Investments |
| General Contractor |
Jansen Group |
| Engineer |
Grunau, Ring & DuChateau |
| Date Completed |
July 2003 |
Pittsburgh Office - Verizon
| Description |
Furnished standpipes, Installed fire department valves, Test and drain riser, 180 sprinklers, Two-hour insulation |
| Owner |
Verizon, Pa. |
| General Contractor |
Jendoco Construction Company |
| Engineer |
LLI Technologies, Inc. |
| Date Completed |
June 2003 |
Milwaukee Office - John P. Raynor, S.J. Library
| Description |
Engineering services, HVAC, Plumbing, Fire protection, Specialty metal fabrication |
| Owner |
Marquette University |
| General Contractor |
Opus North Corporation |
| Architect |
Opus North Architects |
| Engineer |
Grunau Company |
| Manhours |
16,941.74 |
| Date Completed |
May 2003 |
Orlando Office - Bloomingdale's
| Description |
2,000 Sprinklers, 1250 GPM Fire Pump |
| Owner |
Federated Department Stores |
| Date Completed |
2002 |
Orlando Office - Disney Vacation Club - Beach Club Villas
| Description |
6,000 Sprinklers |
| Owner |
Walt Disney Company |
| General Contractor |
PCL Construction |
| Date Completed |
2002 |
Orlando Office - Gaylord Palm Hotel and Convention Center
| Description |
20,000 Sprinklers, 81 Wet systems, Dry system, Preaction system, 225,000 feet of fire protection piping |
| Owner |
Gaylord Entertainment |
| General Contractor |
Perini, Suitt |
| Date Completed |
2002 |
Orlando Office - Parrish Medical Center
| Description |
3,600 Sprinklers,1000 GPM fire pump |
| General Contractor |
Skanska Construction |
| Date Completed |
2002 |
Pittsburgh Office - Steven C. Foster Memorial Theatre
| Description |
Installed 125 wet and dry sprinklers |
| Owner |
University of Pittsburgh |
| General Contractor |
Poerio, Inc. |
| Architect |
WTW |
| Engineer |
H.F. Lenz |
| Date Completed |
September 2002 |
Milwaukee Office - Army Aviation Support Facility-West Bend New Airplane Hanger
| Description |
Plumbing, Fire protection |
| Owner |
State of Wisconsin |
| General Contractor |
Sonag Company, Inc. |
| Architect |
Earth Tech |
| Engineer |
PSJ Engineering |
| Date Completed |
August 2002 |
Milwaukee Office - Wisconsin State Fair Park Exposition Building
| Description |
Engineering services, HVAC, Plumbing, Fire protection |
| Owner |
State of Wisconsin |
| General Contractor |
Findorff Construction |
| Architect |
Eppstein Uhen |
| Engineer |
Grunau Company |
| Manhours |
35,078.25 |
| Date Completed |
August 2002 |
Pittsburgh Office - Carnegie Museum of Pittsburgh
| Description |
Fire line, Standpipes, Electrical wiring of installed flow and tamper switches, Reprogramming of fire alarm panel, 1,300 sprinkler heads |
| Owner |
Carnegie Museum of Pittsburgh |
| Engineer |
Eichleay Engineering, Inc. |
| Date Completed |
August 2002 |
Pittburgh Office - Magee Hospital Parking Garage
| Description |
Installed dry pipe sprinkler system, Dry standpipe system |
| Owner |
Magee Women's Hospital |
| General Contractor |
Turner Construction Company |
| Architect |
Tsoi/Kobus Associates |
| Date Completed |
March 2002 |
Pittsburgh Office - Litchfield Towers, A, B and C
| Description |
Installed wet sprinkers, Acoustical and drywall, Water service for secondary supply, Dry system, Diesel fire pump, Acoustical ceilings |
| Owner |
University of Pittsburgh |
| Engineer |
Burt, Hill, Kosar, Rittleman Associates |
| Date Completed |
2001 |
Pittsburgh Office - Petersen Events Center
| Description |
Installed 1000 gmp electric fire pump, Wet and dry sprinklers |
| Owner |
University of Pittsburgh |
| General Contractor |
Pitt Center Partners |
| Architect |
Apostoluo, Russer |
| Engineer |
Brinjac Engineering |
| Date Completed |
2001 |
Milwaukee Office - Central City Cyberschool of Milwaukee
| Description |
Plumbing, Site utilities, Fire protection, HVAC |
| Owner |
Milwaukee County |
| General Contractor |
Stevens Construction |
| Architect |
Adrian Guszkowski |
| Engineer |
RJ Miller, Adrian Guszkowski |
| Date Completed |
September 2001 |
Milwaukee Office - Time Warner Cable Offices
| Description |
Engineering services, HVAC, Plumbing, Fire protection |
| Owner |
Wisconsin Electric |
| General Contractor |
GPD/Gilbane |
| Architect |
Eppstein Uhen |
| Engineer |
Grunau Company |
| Date Completed |
June 2001 |
Orlando Office - Kennedy Space Center
| Description |
Wet pipe sprinkler system |
| Owner |
NASA |
| General Contractor |
Ivey's Construction |
| Date Completed |
2000 |
Milwaukee Office - Potawatomi Bingo Casino
| Description |
Plumbing, Fire protection, HVAC, Specialty metal fabrication, Snow melt system |
| Owner |
Forest County Executive Council-Gaming Commission |
| General Contractor |
Sverdrup, CG Schmidt |
| Architect |
Graef, Anhalt, Schloemer |
| Engineer |
Ring & DuChateau |
| Date Completed |
December 2000 |
Milwaukee Office - St. Luke's Hospital Vertical Expansion
| Description |
Fire protection, HVAC for four floor addition |
| Owner |
Aurora Health Care |
| General Contractor |
Oscar J. Boldt Construction |
| Architect |
Welman Architects |
| Engineer |
Ring & DuChateau |
| Date Completed |
December 2000 |
Milwaukee Office - Marquette University East Hall Renovation
| Description |
Plumbing, Fire protection, HVAC |
| Owner |
Marquette University |
| General Contractor |
Hunzinger Construction |
| Architect |
Eppstein Uhen |
| Engineer |
Gruanu Company |
| Date Completed |
September 2000 |
Milwaukee Office - Edison School
| Description |
Plumbing, Fire protection, HVAC for 95,000 sq. ft. remodeling |
| Owner |
Milwaukee County |
| General Contractor |
GPD/Gilbane |
| Engineer |
Grunau Company |
| Date Completed |
August 2000 |
Orlando Office - Universal Studios
| Description |
Sprinklers within 33 buildings, Diesel fire pumps, 4500 feet of underground supply with fire hydrants |
| Owner |
Universal Studios |
| General Contractor |
Whiting Turner Construction Company |
| Date Completed |
1999 |
Pittsburgh Office - Cherrington Corporate Center
| Description |
Furnished and installed wet pipe sprinkler system with standpipes |
| Owner |
Cherrington Corporate Center, Eaton, Cytler Hammer |
| General Contractor |
Clayco Construction Company, Inc. |
| Engineer |
Code Consultants, Inc. |
| Date Completed |
1999 |
Milwaukee Office - Eppstein Uhen Architects
| Description |
Engineering services, Plumbing, HVAC, Fire protection, Specialty metal fabrication, Structural steel, Stairs |
| Owner |
Eppstein Uhen Architects |
| General Contractor |
Berghammer Corporation |
| Date Completed |
December 1999 |
Orlando Office - Epcot Center Millennium Village-Walt Disney World
| Description |
Sprinkler heads, Deluge system |
| Owner |
Walt Disney Company |
| General Contractor |
American Bridge, Mivan Florida, B.V.C.S |
| Date Completed |
September 1999 |
Pittsburgh Office - Southpointe
| Description |
Installed fire sprinklers, Standpipes, Wet systems, Alarm and detection systems in various buildings of a commercial and residential development |
| Owner |
Scalo Case Development Company |
| General Contractor |
Mosites Construction Company |
| Architect |
Lorenzi Dodds & Gunill |
| Date Completed |
1998 |
Milwaukee Office - Sinai Samaritan Medical Center Campus Consolidation
| Description |
HVAC, Plumbing |
| Owner |
Sinai Samaritan Medical Center |
| General Contractor |
GPD/Gilbane |
| What Our Customers Say |
"Your field forces were some of the most competent individuals I've ever seen. [They] went way beyond the normal effort required to make a complex mechanical project successful." Gene Hult, General Superintendent - Gilbane |
| Date Completed |
July 1998 |
Milwaukee Office - McKinley Marina
| Description |
Demolition and installation of new fuel, sanitary, fire, water and electrical systems |
| Owner |
Milwaukee County Department of Public Works, Milwaukee County Parks |
| Date Completed |
May 1996 |
Milwaukee Office - Blue Cross Data Center
| Description |
HVAC, Plumbing, Fire protection |
| Date Completed |
1993 |
Milwaukee Office - Grand Avenue School
| Description |
HVAC, Plumbing, Fire protection |
| Date Completed |
1992 |
| | | |