Columbia St. Marys Ozaukee ~ Grafton

BIM, HVAC, Medical Gas, and Electrical Temperature Controls completed on the 266,000 sq ft expansion to this gabled-roof hospital. Grunau continues the customer relationship with ongoing preventive Service and Maintenance at this medical facility. Read more about the expansion in the case study below. Grunau later installed a new duplex rotary vane medical vacuum pump system and 3x3 expandable pressure medical gas oxygen manifold system, including all necessary piping, valves, controls, and alarms for their Urgent Care clinic.

Grunau Location: Wisconsin Office

Owner: Columbia St. Marys

Contractor: Mortenson Construction

Architect: HOK

Engineer: Ring & DuChateau

Man-Hours: 30349

Case Study: Columbia St. Marys Ozaukee ~ Grafton Case Study

Completed: July 2007