Time Warner Cable ~ Milwaukee

Installed HVAC, plumbing, and fire protection in Time Warner Cable's offices in June 2001. In September 2011, recommissioned HVAC equipment and installed a comfort network system for better energy savings. In December 2012, Grunau prefabricated piping to efficiently install a new chiller system on the roof.

Grunau Location: Wisconsin Office

Owner: Wisconsin Electric

Contractor: GPD/Gilbane

Architect: Eppstein Uhen

Engineer: Grunau Company

Completed: December 2012

Prefabricated pipe assembly for efficient chiller install